Laserfiche WebLink
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to gain council approval to commence the planning and <br />engineering of the 2022 Street Maintenance Project. <br /> <br />2. Background. At the April 26th, 2021 Council Work Session the Council provided direction for 2021 <br />street projects. <br /> <br />3. Scope. Planning and engineering will consist of topographic surveying, utility inspections, design, <br />permitting, public input and solicitation of bids for select roads. <br /> <br />4. 2022 Roads. The table below list the streets identified for potential projects in 2022 with planning <br />level estimates for each project. <br /> <br />5. Engineering and Design Cost. Bolton and Menk has provided a scope of services for a fee estimate <br />not to exceed $65,000 (Exhibit A). <br /> <br />6. Funding. The engineering as well as the eventual projects will be funded with a combination of the <br />Pavement Management Fund, Utility Funds, and Stormwater Fund. <br /> <br />a. Funding Needs Estimates. <br />Fund Cost Estimate Est. 2021 End of Year Fund Balance <br />Pavement Fund $ 1,005,300 $ 0 <br />Stormwater Fund $ 168,930 $ 1,300,00 <br />Sanitary Sewer Fund $ 76,500 $ 1,662,915 <br />Water Fund $16,500 $ 125,122 <br />Total $ 1,267,230 <br />Item No.: 8 Date: May 24, 2021 <br />Item Description: 2022 Street Maintenance Planning and Engineering <br />Presenter: Adam T. Edwards <br />City Administrator/City Engineer <br />Agenda <br />Section: <br />Consent Agenda <br />Street Estimated Cost <br />Pavement Stormwater Sanitary Water Total <br />Crystal Bay Neighborhood: <br />Arbor, Crystal, Prospect, <br />Railroad, Spates Avenues <br />$ 224,900 $ 33,735 $ 24,000 $ 0 $282,635 <br />Park –Oak- Linden $ 59,900 $ 8,985 $ 15,000 $ 0 $83,885 <br />West Lake Street $ 37,600 $ 10,920 $ 3,000 $ 0 $51,520 <br />High Lane $ 15,500 $ 2,325 $ 0 $ 0 $17,825 <br />Chippewa Lane $ 65,500 $ 9,825 $ 0 $ 0 $75,325 <br />Kelley Parkway (West Half) $ 85,700 $ 25,710 $6,000 $ 16,500 $133,910 <br />Dickenson Street $ 165,600 $ 24,840 $ 6,000 $ 0 $196,440 <br />Orono Lane $48,100 $ 7,215 $ 4,500 $ 0 $59,815 <br />Highwood $ 81,000 $ 12,150 $ 0 $ 0 $93,150 <br />Dakota Avenue $ 44,300 $ 6,645 $ 0 $ 0 $50,945 <br />Lakeview Terrace & Country <br />Club $ 177,200 $ 26,580 $ 18,000 $ 0 $221,780 <br />2022 projects TOTAL $ 1,005,300 $168,930 $76,500 $16,500 $1,267,230