My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Master Punchlist - Aug 9th - Aug 27th 2001
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2040 Wayzata Boulevard West - 34-118-23-21-0036 - (Orono HRA)
>
Land Use
>
2040 Wayzata Blvd Land Use - Dunbar
>
DUNBAR Project - File cabinet 1
>
Master Punchlist - Aug 9th - Aug 27th 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:55:43 PM
Creation date
10/18/2021 12:24:50 PM
Metadata
Fields
Template:
x Address Old
House Number
2040
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2040 Wayzata Boulevard West
Document Type
Land Use
PIN
3411823210036
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> O Financial Guarantee. The Developers Agreements for the Senior Housing and <br /> the Office Site are two separate Agreements. Each include the requirement of a <br /> financial guarantee by the applicant to ensure the completion of site <br /> improvements. The City Engineer will complete an estimate of improvement <br /> costs when final plans have been submitted and approved, including but not <br /> limited to landscaping, grading, erosion control, utilities, driveways and parking <br /> areas, trails, sidewalks, retaining walls and stormwater management facility <br /> construction, and the applicant shall provide to the City a financial guarantee of <br /> 150% of the improvement costs (letter of credit is City's standard practice). <br /> Developer needs to discuss with City how the costs should be divided between the <br /> two sites if they are not developed concurrently... <br /> O Park Dedication Fee. Payment of Park Dedication fee of$33,125 for the Office <br /> site and $31,000 for the Senior Housing site. <br /> O Sewer and Water Connection Charges. No sewer and water connection charge <br /> is due for the Office site. However, the amount of the S&W connection charge <br /> attributable to the Senior Housing site (which amount will be deferred) is arrived <br /> at by use of the following formula: <br /> (A+ B) - 41 x 6.7 acres x $13,545/acre = Connection Charge Due <br /> (A+ B) <br /> where: A=number of senior housing dwelling units = 62 <br /> B = number of SAC units required for office building <br /> 41 =number of sewer/water units paid previously <br /> If the Office building requires 12 SAC units, then the amount to be deferred <br /> for the Senior Housing is: <br /> [(62+12)-41]/(62+12)= 33/74 = 0.446 x 6.7 x $13,545 = $40,475 <br /> If the office building requires 10 SAC units, then the amount to be deferred for the <br /> Senior Housing is: <br /> [(62+10)-41]/(62+10) = 31/72 = 0.431 x 6.7 x $13,545 = $39,114 <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.