My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MPG 5-1-01 Draft
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2040 Wayzata Boulevard West - 34-118-23-21-0036 - (Orono HRA)
>
Land Use
>
2040 Wayzata Blvd Land Use - Dunbar
>
DUNBAR Project - File cabinet 1
>
MPG 5-1-01 Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:55:43 PM
Creation date
10/12/2021 3:45:27 PM
Metadata
Fields
Template:
x Address Old
House Number
2040
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2040 Wayzata Boulevard West
Document Type
Land Use
PIN
3411823210036
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br /> access connection to a public road in Outlot D, Sugar Woods shall not automatica <br /> terminate the private road status of the internal road system. <br /> Off-site access improvements that are the responsibility of the developer shall include <br /> establishment of the right-in/right-out access curbing for the southerly access.Any turn-lane <br /> or acceleration lane improvements or re-striping that may be required by MnDOT for that <br /> access shall be the responsibility of the City. Other off-site access improvements that will <br /> be the responsibility of the City shall include establishment of the semaphore and related <br /> improvements at the intersection of Brown Road North and Highway 12 <br /> 5. Building Design and Construction. The buildings on Lots 1 and 2 shall be constructed <br /> according to the plans on file with the City. On Lot 1, the plans indicate a two story office <br /> building with parking on the basement level. The second story is set back from the first story <br /> at the north end of the building to reduce impacts to the residential neighborhood to the <br /> north. Windows are also minimized on the north end of the office building to reduce impacts <br /> on neighboring properties. The roof is a standard shingle hip roof with pitch established at <br /> _:1 to minimize the impacts of building height. The exterior of the office building shall be <br /> of . Any accessory structures.on <br /> Lot 1, if approved, shall be of the same exterior finish and colors as the office building. <br /> On Lot 2, the plans indicate a 2-3 story, 62-unit senior housing apartment building with <br /> parking on the basement level. The westerly 2/3 of the building is 3 stories in height, the <br /> easterly 1/3 is 2 stories in height. The building has a standard shingle hip roof system at an <br /> established pitch of :1 to minimize the impacts of building height. The exterior of the <br /> senior housing apartment building on Lot 2 shall be of .Any <br /> accessory structures on Lot 2,if approved, shall be of the same exterior finish and colors as <br /> the senior housing apartment building. <br /> Construction of the buildings on Lots 1 and 2 shall be in conformance with the building <br /> codes and regulations adopted by the City of Orono. Any changes to the gross square <br /> footage,footprint/wall/roof dimensions,defined building height or number of dwelling units <br /> shall require a prior amendment to this Agreement. <br /> 6. Landscaping. The landscaping plan attached to this Agreement as Exhibit shall be <br /> strictly adhered to. Within Lot 1,the Developer shall establish suitable vegetative screening <br /> along the northerly boundary of the property sufficient to substantially block direct view of <br /> most vehicle headlights from the adjoining Sugar Woods residential properties. Within Lots <br /> Page 4 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.