My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rough Draft Agreement - PUD #2 - 4-30-2001
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2040 Wayzata Boulevard West - 34-118-23-21-0036 - (Orono HRA)
>
Land Use
>
2040 Wayzata Blvd Land Use - Dunbar
>
DUNBAR Project - File cabinet 1
>
Rough Draft Agreement - PUD #2 - 4-30-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:55:48 PM
Creation date
10/12/2021 3:45:14 PM
Metadata
Fields
Template:
x Address Old
House Number
2040
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2040 Wayzata Boulevard West
Document Type
Land Use
PIN
3411823210036
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A single direct access to Highway 12 shall be developed at a location approximately 500 feet <br /> west of the intersection of Brown Road and Highway 12. This direct access shall be <br /> restricted to westbound right-in/right-out turning movements, and shall be subject to <br /> MnDOT design approval. <br /> A third access point located near the northwest corner of Lot 1 shall provide for future access <br /> to a future public road which may be constructed within Outlot D, Sugar Woods. At such <br /> time that a public road is constructed within said Outlot D, the City shall have the right to <br /> connect such public road to the internal road system within Lots 1 and 2 for the purpose of <br /> providing additional ingress/egress options for Lots 1 and 2 as well as provide ingress/egress <br /> options for properties west of Lot 1. <br /> The Developer shall grant to the City public road, drainage and utilities easements over the <br /> private road corridor including all surface parking areas,in order that future public use of the <br /> roadways is ensured in the event that a future connection to the west is established. <br /> Developer shall grant cross easements between Lots 1 and 2 to ensure full use of the internal <br /> private road system until such time that the City exercises its easement rights to convert all <br /> or a portion of the internal road system to a public road status. It is specifically agreed that <br /> the City is not obligated to maintain the private internal road system until such time that the <br /> City chooses to convert the internal road system to a public road, and construction of an <br /> access connection to a public road in Outlot D, Sugar Woods shall not automatically <br /> terminate the private road status of the internal road system. <br /> Off-site access improvements that are the responsibility of the developer shall include <br /> establishment of the right-in/right-out access curbing for the southerly access.Any turn-lane <br /> or acceleration lane improvements or re-striping that may be required by MnDOT for that <br /> access shall be the responsibility of the City. Other off-site access improvements that will <br /> be the responsibility of the City shall include establishment of the semaphore and related <br /> improvements at the intersection of Brown Road North and Highway 12 <br /> 5. Building Design and Construction. The buildings on Lots 1 and 2 shall be constructed <br /> according to the plans on file with the City. On Lot 1, the plans indicate a two story office <br /> building with parking on the basement level. The second story is set back from the first story <br /> at the north end of the building to reduce impacts to the residential neighborhood to the <br /> north. Windows are also minimized on the north end of the office building to reduce impacts <br /> on neighboring properties. The roof is a standard shingle hip roof with pitch established at <br /> :1 to minimize the impacts of building height. The exterior of the office building shall be <br /> of . Any accessory structures on <br /> Lot 1, if approved, shall be of the same exterior finish and colors as the office building. <br /> On Lot 2, the plans indicate a 2-3 story, 62-unit senior housing apartment building with <br /> parking on the basement level. The westerly 2/3 of the building is 3 stories in height, the <br /> easterly 1/3 is 2 stories in height. The building has a standard shingle hip roof system at an <br /> established pitch of :1 to minimize the impacts of building height. The exterior of the <br /> senior housing apartment building on Lot 2 shall be of .Any <br /> Page 3of14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.