Laserfiche WebLink
4465 Bdysltle Ko., Drono INSPECTOR CHECKLIST - mound <br />WELL setbacks: 20' to pressure tested sewer line (5 psi for 15 min) <br />50' to everything 111- to dispersal area with shallow wait <br />PROPERTY LINES setback: IV to everything <br />Road setback: platted: 10' prop line. Metes 8 bounds: out of road easement, or outer ditch. <br />LAKE / BLUFF setback: 20' for bluff. Lakes: GD _, RD _, NE — Protected wetland _ <br />Building setbacks: 10' for everything, 20' for dispersal area. <br />WATER LINE under pressure sc 10' to bed,tank 8 sewer line. (else sewer line > 12" below) <br />Sewer line & baffle connection (no 9Vs, T between 45's, slope min 1" m 8', max 2" in 8') <br />(no depth reqs, clean out every 100', Sch 40 pipe) <br />Septic tank and risen (water tight, insulated, proper depth, existing verified by pumping) <br />Mfg 1500 gallons none <br />Riser over outlet, riser over inlet or center, and 6"+ inspection pipe over any remaining baffles. <br />No effluent filter 8 alarm <br />Dose tank risers and piping (water tight, insulated, proper depth, drainback) <br />mfq 1250 gallons <br />dose pump 38 gpm 30 head VERIFY PUMP CURVE 4.9 min ON 9 hr OFF <br />float setting drop 7.2 inches at 26.0 gpi "DESIGNED" 4.6 inches approx float tether length <br />186.0 gal dose divided by gpi "INSTALLED" = _inches float drop (field corrected <br />LABEL pump requirements and drawdown on riser or panel <br />Cam lock reachable from grade - 30" max. J -hook weep hole. Supply line access (no hard 90's) <br />2.0 inch supply pipe: SCh40, sloped 1/8"., supported by 4" sch40 sleeve or compacted, and buried 6"+. <br />splice box / control pane( / electrical connections <br />flow measurement: CT, ETM, time dosed, home water meter <br />mound absorption area rough up <br />mound rock dimensions 10.0 X 50.0 <br />Sand lift depth 14 inches. (Jar test : 2- sand leaves < 1/8" silt after 30 min) <br />Absorption Sand beyond rock 0.0 upslope 17.0 downslope <br />❑ Bermed topsoit beyond rockbed 10 upslope 16 sideslope 23 downslope <br />cover depth of 12-18"+ VERIFY <br />3 laterals (1-2' from edge of rock) <br />2.00 inch pipe size (Sch40 pipe 8 fittings) <br />3.0 ft lateral spacing <br />e 1/4" inch perforations <br />3.0 ft perforation spacing <br />Air inlet at end of laterals, and at top feed manifold if necessary. VERIFY <br />clean outs (no hard 90's) <br />4" inspection pipe to bottom of rock, anchored VERIFY <br />Abandon existing system - if necessary =Re -use existing tank certification <br />monitoring plan and type <br />wet( abandonment form - if necessary <br />