My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-30-2018 Septic Design
Orono
>
Property Files
>
Street Address
>
H
>
Hunter Drive
>
1130 Hunter Drive- 25-118-23-42-0007 (Formerally 300 Sixth Ave N)
>
Septic
>
10-30-2018 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:14 PM
Creation date
10/1/2021 2:29:48 PM
Metadata
Fields
Template:
x Address Old
House Number
1130
Street Name
Hunter
Street Type
Drive
Address
1130 Hunter Drive
Document Type
Septic
PIN
2511823420007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
instructions: = = enter data t = adjust if desired 0 = computer calculated - DO NOT CHANGE! <br />I t =bedroorn Type �I Residential System <br />3) 750 GPD design flow <br />3) Yes Garbage disposal or pumped to septic 50% larger tank with multiple comp/tanks <br />4) 2250 Gal Septic tank (code minimum) 2250 Gal Septic tank (design size /LUG req'd) <br />Tank options: none <br />s) 1.2 GPD/ftz mound sand loading rate contour loading rate of =req's a min 63 ft. long rockbed <br />6) =ft rockbed width 63.0 ft rockbed length <br />7) =ft lateral spacing 3.0 ft perforation spacing (maximum of 3 for both) <br />end feed manifold connection <br />S) I (laterals 61.0 feet tong 21.0 perfs / lateral F 63 perfs total <br />(1 /2 a perf means the first perf starts at the middle feed manifold) <br />3i 7/32 inch perfs at =feet residual head gives 0.56 gpm flow rate per perforation <br />for this perf size ft spacing, Et pipe size on line 12, max perfs/lateral = 30 line #8 must be less --> OK <br />io) =doses per day (4 minimum) <br />i 1 t 188 gallons per dose (treatment volume) <br />2.00 5x <br />12) 2.00 inch diameter laterals must be used to meet "4x pipe volume" requirement <br />2.00 3x <br />3t 60 feet of 2.0 inch supply line leads to 10 gallons of drainback volume <br />(Tip: "top feed" manifold to control the drainback) <br />4) F198 gallons TOTAL pump out volume (treatment + drainback) <br />t5) F3�6GPM <br />feet vertical lift pump to mound laterals, leads to a: <br />t6) C� 20 feet of head, Pump requirement (note: >50gpm may require an extra 3-6' of head) <br />17) 750 gal Dose tank (code minimum) 1300 gal Dose tank (design size / LUG req'd) at 25,49 gpi <br />leads to a <br />tat =inch swing on Demand float, or timed dosing of5.5 min ON (confirm pump rate with drawdown <br />(this delivers Average flow, =70% of Peak design flow)hrs OFF test and adjust as necessary) <br />t9)Itinches <br />inches from bottom of tank to "Pump OFF" float <br />20) inches from bottom of tank to "Pump ON" float, or 12 inches to "Timer ON" float if time dosed <br />21) from bottom of tank to "Hi Level" float, or 33 inches to "Hi Level" float if time dosed <br />22)714 gatlons reserve capacity (after High Level Alarm is activated) <br />0.45 gpd/ftz Absorption area Soil Loading Rate, which gives a mound ratio of2.7 (minimum) <br />(this must match the soil boring log) desired mound ratio 2.7 <br />=percent site slope (0-20% range) = (% downslope site slope, if different than upslope) <br />18 3riches, or 1.5 ft. to Redox or other limiting condition (need at least 12" to be a Type 1) <br />Treatment zone contains inches of 0% soil credit, and F 701nches of 50% soil credit. Giving a: <br />=inch, or 1.5 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br />26.$ ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br />0.0 ft. upslope and sideslope <br />
The URL can be used to link to this page
Your browser does not support the video tag.