Laserfiche WebLink
Installer Summary <br />2250 gallon Septic tank (minimum) Tank options: none <br />au7a Larger LdnK WIM rnuuipre comer LanKs <br />1250 gallon Dose tank (minimum) at 25.49 gpi <br />29 GPM ft. of head, Pump required <br />7.7 inch swing on Demand float which translates to roughly 49 inches of float tether length <br />if time dosing is required -->6.7 minutes ON time $ ®hours OFF time <br />20 inches from bottom of tank to "pump ON" float, or 12 inches to "timer ON" float <br />23 inches from bottom of tank to "Hi Level Alarm" or 33 inches to "Hi level alarm" if time dosed <br />265 ft. of 2.0 inch supply Eine with end feed manifold connection <br />(Tip: "top feed" manifold to control drainback) <br />20 inch, or 1.7 ft. Sand Lift Mound <br />10.0 ft. wide by 50.0 ft. tong Rock bed <br />3 laterals 2.00 inch diameter 48.0 ft. long F 3.p ft. lateral spacing <br />7/32 inch perfs 3.0 ft. perforation spacing <br />No Effluent filter if alarm <br />3 clean out ix valve box assemblies <br />27.0 ft.Total sand ABSORPTION width (minimum) <br />0- 07 ft. upslope and sideslope (sand beyond rockbed, minimum) <br />17.0 ft. Downslope (sand beyond rockbed, minimum) <br />Specific slope ratios give BERM widths (topsoil beyond rockbed) of: <br />4:1 upslope ratioT]17� <br />ft. upslope berm <br />4:1 sideslope ft. sideslope berms <br />4:1 downslope ft. downslope berm <br />berm 1z <br />MA <br />1.3 <br />1-imititig Condition `- <br />4" inspection pipe <br />r— 18" cover can top <br />12"' cover can sides <br />(6" loamy cap & 6" topsoil) <br />Clean sand lift <br />Depth to Limiting <br />---- <br />Absorption Width—�— ,— - <br />Note: <br />For 0 to 1" slopes, Absorption Width is measured from the Bedequally in both directions. <br />For slopes >1, Absorption Width is measured downhill from the upslope edge of the Bed. <br />Rock Bed: 17.0 yd3 or *1.4= 24 ton <br />Mound Sand: 185 yd3 or *1.4= 259 ton <br />Loamy Cap: 68 yd3 or *1.4m 95 ton <br />Topsoil: 79 yd3 or *1.4= 111 ton <br />inches under pipe <br />calculation based on 3:1 /4:1 slope from top of rockbe, <br />6" deep <br />6" deep <br />