My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-05-2018 Septic Design
Orono
>
Property Files
>
Street Address
>
M
>
Mooney Lake Drive (Formeraly 300 Sixth Ave N)
>
1180 Mooney Lake Drive - 25-118-23-41-0016
>
Septic
>
07-05-2018 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:06 PM
Creation date
10/1/2021 11:17:17 AM
Metadata
Fields
Template:
x Address Old
House Number
1180
Street Name
Mooney Lake
Street Type
Drive
Address
1180 Mooney Lake Drive
Document Type
Septic
PIN
2511823410016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mie isuu gauons <br />❑ dose pump 36 gpm 56 head VERIFY PUMP CURVE 7 min ON 9 hr OFF <br />F—]floatsetting drop 9.8 inches at 25.5 gpi "DESIGNED" 5.9 inches approx float tether length <br />251.0 gal dose divided by gpi "INSTALLED" = inches float drop (field corrected <br />LABEL pump requirements and drawdown on riser or panel <br />Cam lock reachable from grade - 30" max. J -hook weep hole. Supply line access (no hard 90's) <br />2.0 inch supply pipe: Sch40, sloped 1/8"+, supported by 4" sch40 sleeve or compacted, and buried 6"+. <br />splice box / control panel / electrical connections <br />flow measurement: CT, ETM, time dosed, home water meter <br />mound absorption area rough up <br />mound rock dimensions 10.0 X 63.0 <br />Sand lift depth 12 inches. (Jar test : 2" sand leaves < 1 /8" silt after 30 min) <br />Absorption Sand beyond rock 0.0 upslope 17.0 downslope <br />Bermed topsoil beyond rockbed 10 upslope 11 sideslope 20 downslope <br />cover depth of 12-18"+ VERIFY <br />3 laterals (1-2' from edge of rock) <br />2.00 inch pipe size (Sch40 pipe Ft fittings) <br />3.0 ft lateral spacing <br />e 7/32 inch perforations <br />3.0 ft perforation spacing <br />Air inlet at end of laterals, and at top feed manifold if necessary. VERIFY <br />clean outs (no hard 90's) <br />4" inspection pipe to bottom of rock, anchored VERIFY <br />Abandon existing system - if necessary =Re -use existing tank certification <br />monitoring plan and type <br />well abandonment form - if necessary <br />z <br />re <br />x <br />YCL <br />@ <br />IZZ <br />¢- <br />a <br />a <br />�o <br />0 <br />f— <br />cm <br />v <br />c <br />tj <br />c cc <br />H <br />CL <br />z <br />re <br />Y <br />IZZ <br />¢- <br />a <br />a <br />�o <br />0 <br />Y <br />cm <br />v <br />c <br />tj <br />c cc <br />H <br />
The URL can be used to link to this page
Your browser does not support the video tag.