Laserfiche WebLink
Keep all heavy equipment off of the proposed treatment area before and after <br />construction. The treatment area should be marked off before construction. This <br />design is not valid & the system will need to be relocated if failure to protect the <br />sites for new on-site sewage systems. <br />MANAGEMENT PLAN: <br />The tanks need to be maintained at a minimum of 1 time every 2 years, check with <br />you pumper to set up a schedule. <br />System inspected for areas by owner & or Inspector as determined by the local unit <br />of Government. <br />Any other requirements as determined by the local unit of Government. <br />With proper installation & maintenance, this system should have no problem in <br />treating septic effluent effectively. <br />Nothing other than human waste, toilet tissue, laundry, showers, water softners etc. <br />should be disposed of into the system. Recommend iron filters be diverted out of the <br />system. Garbage disposals are not recommended. Excessive amounts of soaps, <br />antibacterial soaps, cleaning agents, shower cleaners used every shower & chlorine <br />agents may kill the bacteria needed to treat septic effluent. Additives are not <br />recommended. Recommend laundering be limited to 3 to 4 loads per day. The Multi - <br />Flo Unit will need to be pumped when the settable solids reach 40%. Schirmers <br />Wastewater will meet the pumper & clean out the Multi -Flo at the same time. There <br />will not be a charge from Schirmers Wastewater as long as pumping is only needed 1 <br />time every 3 years. The pumping charges from a licensed pumper are you <br />responsibility. <br />Thank Y u <br />Steven B. Schirmers <br />This Djsn resuire signature from an Advanced Designer <br />ZM1 <br />Bernie Miller Lot 2, Block 1, Fox Bill Orono date <br />