Laserfiche WebLink
The first tank will be a 1500 gallon dual chamber tanks reversed using the 500 gallon <br />side as the trash trap & the 1000 gallon side as a dosing chamber (pump #1) which <br />will dose 15.6 gallon every 30 minutes with a timer to the 750 gallon Multi -Flo Unit. <br />The effluent will flow gravity from the Multi -Flo to a new 1500 gallon pumping <br />chamber ( pump 92) which will pressurized the seepage bed. The power supply & <br />switches must be located outside the manhole & pumping chamber in a weather <br />proof enclosure. A warning device must be installed with a light & sound device. <br />This is in case of a pump failure. <br />Monitoring of the drainfield, is required immediately after the system is installed. <br />2097 Service contract for Multi -Flo is $225.00, monitoring drainfield 1 x a year is <br />$50.00 when we service the Multi -Flo. Price subject to change. An operating permit <br />is required with the County at all times. <br />If the tanks have less than 2' of cover, the lids, risers & maintenance hole covers <br />must be insulated to a value of R10. <br />Cleanouts for each lateral with a sleeve must be insulated & be accessible from <br />finished grade in an irrigation box with a ball valve. <br />A water meter or event counter must be installed to monitor daily water use. The <br />homeowner is responsible for the water meter readings. <br />The mitigation plan is if hydraulic overloading would occur, a timer could be installed <br />to reduce the amount of effluent pumped to the system and also by using the 1500 <br />gallon pumping chamber allows the effluent to be stored during peak use and <br />pumped to the system during low water use periods. The second would be to install <br />holding tanks. <br />All neighboring wells are located greater than 100' away from the proposed <br />treatment area. <br />