My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Excel & Minnesota Department of Commerence
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Excel Energy 2012-2013/Correspondence & MN Dept of Commerce - Mike Gaffron File Cabinet 1
>
Excel & Minnesota Department of Commerence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/29/2021 10:33:46 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Xcel Energy® <br /> 414 Nicollet Mall <br /> RESPONSIBLE BY NATURE" Minneapolis, Minnesota 55401-1993 <br /> December 16, 2013 <br /> VIA ELECTRONIC FILING <br /> Dr. Burl W. Haar <br /> Executive Secretary <br /> Minnesota Public Utilities Commission <br /> 350 Metro Square Building <br /> 121 Seventh Place East <br /> St. Paul, MN 55101 <br /> Re: 4.6.2 As-Built Plans and specifications and 4.6.3 GPS Information for Orono <br /> Substation Replacement and New 115 kV Transmission Line Project Docket <br /> No. E002/TL-11-223 <br /> Dear Dr. Haar: <br /> Northern States Power Company, doing business as Xcel Energy, obtained a route permit(dated <br /> April 6, 2012)to relocate approximately 0.2 miles of Xcel Energy Line 0831,to construct <br /> approximately 0.4 miles of new double-circuit 115 kV transmission line between line 0831 and <br /> the Orono Substation and to expand and modify the Orono Substation to accommodate the new <br /> 115 kV transmission line. <br /> Route Permit Condition 4.6.2 As-Builts states that the Permittee shall submit copies of all the <br /> final as-built plans and specifications developed during the project. Enclosed with this letter <br /> please find final signed plan drawings of as-built structure locations. <br /> Condition 4.6.3 GPS Data states that the Permittee shall submit to the Commission geo-spatial <br /> information for all structures associated with the transmission line, each switch and each <br /> substation connected. The table below contains coordinates for each structure location in the <br /> UTM 15N coordinate system in US feet. <br /> STR.# X(ft) Y(ft) Z(ft) DESC. <br /> 0831-076(NEW) 1477979.16 16348093.75 964.26 5P <br /> 0831-076-1 (NEW) 1477690.95 16347903.76 963.85 076-1 <br /> 0831-076-2(NEW) 1478253.59 16347596.22 964.07 076-2 <br /> 0831-076-3(NEW) 1478781.67 16347193.24 963.61 076-3 <br /> 0831-076-4(NEW) 1478849.87 16346509.50 967.87 076-4 <br /> 0831-077(NEW) 1477205.03 16348138.60 962.64 831 <br /> 0831-078(NEW) 1476694.27 16348022.94 968.38 5P <br /> ORONO SUB. 1478801.43 16346430.58 976.31 51 <br /> ORONO SUB. 1478835.43 16346430.59 976.31 S2 <br /> ORONO SUB. 1478874.43 16346430.61 976.31 S3 <br /> ORONO SUB. 1478908.43 16346430.62 976.31 S4 <br /> A GIS point file containing these points will also be provided to MNGEO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.