My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Excel & Minnesota Department of Commerence
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Excel Energy 2012-2013/Correspondence & MN Dept of Commerce - Mike Gaffron File Cabinet 1
>
Excel & Minnesota Department of Commerence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/29/2021 10:33:46 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jt <br /> ?) <br /> Xcel Energyg <br /> 414 Nicollet Mall <br /> RESPONSIBLE ST NATURE" Minneapolis, Minnesota 55401-1993 <br /> May 8, 2013 <br /> VIA ELECTRONIC FILING <br /> Dr. Burl W. Haar <br /> Executive Secretary <br /> Minnesota Public Utilities Commission <br /> 350 Metro Square Building <br /> 121 Seventh Place East <br /> St. Paul, MN 55101 <br /> Re: Project Update—Misplaced Structure <br /> Orono Substation Replacement and New 115 kV Transmission Line Project <br /> Docket No. E002/TL-11-223 <br /> Dear Dr. Haar: <br /> Northern States Power Company, doing business as Xcel Energy, obtained a route permit(dated <br /> April 6,2012)to relocate approximately 0.2 miles of Xcel Energy Line 0831,to construct <br /> approximately 0.4 miles of new double-circuit 115 kV transmission line between line 0831 and <br /> the Orono Substation and to expand and modify the Orono Substation to accommodate the new <br /> 115 kV transmission line. <br /> Construction on the new substation began in September 2012 and line construction began in <br /> February of 2013. Last week, it was discovered that the as-built location for structure 076-4,the <br /> first new transmission pole north of the substation on Xcel Energy substation property was <br /> constructed approximately 120 feet further north than intended and has resulted in <br /> inadequate operating clearance to the GRE 69 kV Line as constructed. A map indicating details <br /> is attached for reference. Neighboring landowners were notified of this issue on May 7, 2013. <br /> Xcel Energy is proposing to move the structure to the location that was approved in the Plan and <br /> Profile submitted to the Minnesota Public Utilities Commission on January 18, 2013 with <br /> updates provided on February 7 and March 22,2013. In order to do this crews would construct a <br /> new concrete drilled pier foundation in the correct location on Xcel Energy property, move the <br /> steel pole to the new foundation, re-string conductor and shield wires to the substation <br /> termination structure. The remaining foundation would be removed to below grade and the <br /> surface area would be filled with topsoil and restored. <br /> Department of Commerce EFP staff have asked that Xcel Energy evaluate any possible options <br /> that would allow the structure to be left where it is currently placed in addition to the proposed <br /> option to move the pole. Analysis of alternatives is currently underway. Xcel Energy will <br />
The URL can be used to link to this page
Your browser does not support the video tag.