Laserfiche WebLink
a <br /> ir <br /> Energy Facility Permitting <br /> MINNESOTA 85 7th Place East,Suite 500 <br /> DEPARTMENT OF St. Paul, Minnesota 55101-2198 <br /> COMMERCE ph 651.296.4026 I fax 651.297.7891 <br /> \ ...46 http://mn.gov/commerce/energyfacilities <br /> April 12, 2013 <br /> Burl W. Haar <br /> Executive Secretary <br /> Minnesota Public Utilities Commission <br /> 127 7th Place East, Suite 350 <br /> St. Paul, MN 55101-2147 <br /> RE: Department of Commerce, Energy Facility Permitting Review of Compliance Filing <br /> Alignment Modification <br /> Orono Substation Expansion and New 115 kV Transmission Line Project <br /> PUC Docket No. E-002/TL-11-223 <br /> Dear Dr. Haar: <br /> Attached are the review and comments of the Minnesota Department of Commerce Energy <br /> Facility Permitting (EFP) staff in the above stated matter. <br /> The compliance documents were filed on March 22, 2013, by: <br /> Ellen Heine <br /> Northern States Power Company,a Minnesota Corporation <br /> Xcel Energy Services, Inc. <br /> 414 Nicollet Mall,MP-8 <br /> Minneapolis, MN 55401 <br /> Northern States Power Company, a Minnesota Corporation (Xcel Energy) proposes to replace <br /> the existing 69 kV Orono Substation with a new 115 kV Substation at the same location, but with <br /> a larger footprint and connect the replacement new substation to the existing Xcel Energy 115 <br /> kV transmission line 0831 through a new double circuit 115 kV transmission lines of <br /> approximately 2,040 feet. <br /> EFP staff is providing you with comments and recommendations and is available to answer any <br /> questions the Commission may have. <br /> Sincerely, <br /> r,,,,tj✓!haaar <br /> Suzanne Lamb Steinhauer, DOC EFP Staff <br />