Laserfiche WebLink
4.8.1 of the permit, which requires the Permittee to comply with the clearances, design, and <br /> construction practices outlined in the National Electric Safety Code. <br /> Department staff believes that the information included in the February 8, 2013, filing contains <br /> the necessary information, within the specified time period required in the HVTL Route Permit. <br /> Report of Archaeological Survey <br /> Department staff has reviewed the Report of Archaeological Survey required by section 5.4 of <br /> the permit, and has concluded that the report contains the necessary information, within the <br /> specified time period required in the HVTL Route Permit. <br /> Recommendation <br /> EFP staff recommends that the Commission advise Xcel Energy in writing that it has completed its <br /> review of the documents and determined that the planned construction of the transmission line is <br /> consistent with the terms and conditions of the HVTL permit issued by the Commission in this <br /> docket. <br /> The filing meets applicable permit conditions: ®Yes n No ❑ Partially <br /> Permit condition requires an action by the ❑ Yes ®No <br /> Commission: <br /> EFP suggests filing be brought to the Commission ❑ Yes ®No <br /> for decision: <br /> Response letter to permittee is recommended: ® Yes ❑ No <br /> Suzanne Lamb Steinhauer February 12, 2012 <br /> Energy Facility Permitting Project Manager Date <br /> MN Dept of Commerce <br />