My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Excel & Minnesota Department of Commerence
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Excel Energy 2012-2013/Correspondence & MN Dept of Commerce - Mike Gaffron File Cabinet 1
>
Excel & Minnesota Department of Commerence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/29/2021 10:33:46 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Right-of-way width should be identified on the satellite photos to ensure consistency with <br /> Section 3.3 of the permit. <br /> 4. A legend identifying the markings shown on the satellite photos should be provided. <br /> 5. An explanation should be provided for an apparent discrepancy between the height of <br /> Structure 077 in Section 2.3 of the permit (70 to 90 feet), and sheet NH-253583-15 in the <br /> filing (100 feet). <br /> Department staff has advised Xcel Energy staff of these issues and understands that Xcel Energy <br /> is working to provide additional information in a timeframe that allows construction to proceed <br /> during frozen conditions. Department staff also has advised Xcel Energy to submit paper and <br /> CD copies these with future Plan and Profile filings as required in the Compliance Filing <br /> Procedures attached to the permit. <br /> Report of Archaeological Survey <br /> On September 19, 2012, Xcel Energy filed a Report of Archaeological Survey, as required by <br /> section 5.4 of the permit. <br /> Department staff inadvertently overlooked this filing at the time it was filed, but has reviewed <br /> the documentation and has concluded that the documentation is in compliance with the terms and <br /> conditions of the HVTL Route Permit issued by the Commission in this docket. <br /> Recommendation <br /> Department staff will provide comments upon Xcel Energy's filing of supplemental information. <br /> Department staff recommends that the Commission take no action on the filings at this time. <br /> The filing meets applicable permit conditions: n Yes ❑ No ® Partially <br /> Permit condition requires an action by the ❑ Yes ®No <br /> Commission: <br /> EFP suggests filing be brought to the Commission <br /> ❑ Yes ®No <br /> for decision: <br /> Response letter to permittee is recommended: ❑ Yes ®No <br /> Suzanne Lamb Steinhauer February 7, 2012 <br /> Energy Facility Permitting Project Manager Date <br /> MN Dept of Commerce <br />
The URL can be used to link to this page
Your browser does not support the video tag.