My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Excel & Minnesota Department of Commerence
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Excel Energy 2012-2013/Correspondence & MN Dept of Commerce - Mike Gaffron File Cabinet 1
>
Excel & Minnesota Department of Commerence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/29/2021 10:33:46 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Energy Facility Permitting <br /> MINNESOTA <br /> l. <br /> 85 7th Place East,Suite 500 <br /> DEPARTMENT OF St. Paul, Minnesota 55101-2198 <br /> phhbs —Ali 651.296.4026fax 651.297.7891 <br /> COMMERCE I <br /> htt ://mn. ov/commerce/ener facilities <br /> P g gY <br /> PERMIT COMPLIANCE FILING REVIEW <br /> PUC Docket No. E002/TL-11-223 <br /> Northern States Power Company, A Minnesota Corporation(Xcel Energy) filed compliance <br /> documents pertaining to the Route Permit issued by the Commission on April 6, 2012, for the <br /> Orono Substation Expansion and New 115 kV Transmission Line Project. <br /> The following documents were submitted in accordance with the HVTL Route Permit: <br /> Filing Permit Description e-Docket Document Date Filed <br /> Number Section Number <br /> 1 4.1 Plan and Profile— 20131-82914-01 January 18, 2013 <br /> Transmission Line <br /> 2 5.4 Report of 20129-78807-01 September 19, 2012 <br /> Archaeological Survey <br /> Plan and Profile—11 S kV Transmission Line <br /> Section 4.1 of the Route Permit provides that: <br /> At least thirty (30) days before right-of-way preparation for construction begins on any <br /> segment or portion of the project, the Permittees shall provide the Commission with a <br /> plan and profile of the right-of-way and the specifications and drawings for right-of-way <br /> preparation, construction, transmission structure specification and locations, and <br /> restoration for the transmission line. The documentation shall include maps depicting <br /> the plan and profile including the right-of-way alignment and structure in relation to the <br /> route and alignment approved per the permit. <br /> On January 18, 2013, Xcel Energy filed signed Plan and Profile drawings of the proposed <br /> transmission line. Xcel Energy has informed Department staff that it wishes to begin <br /> construction while the ground is frozen. <br /> Department staff has reviewed the filing and believes that it is incomplete in its current state. In <br /> the judgment of Department staff, additional material is required to ensure that the filing meets <br /> the intent of the permit: <br /> 1. Section 4.1 of the permit requires the permittee to provide information on right-of-way <br /> (ROW)preparation and restoration. Although the filing does indication the location and <br /> dimension of structures, information on right-of-way preparation and restoration is <br /> missing. Department staff has advised Xcel Energy that this requirement may be met <br /> with an addendum describing how ROW will be prepared and restored, including <br /> information on removal of existing poles. <br /> 2. As required in Special Condition 5.2, Swan Flight Diverters are to be installed at 25' <br /> intervals. This should be noted on the plan and profile sheets. <br />
The URL can be used to link to this page
Your browser does not support the video tag.