I <br /> I3.9 Associated Facilities and Substations <br /> The project would include replace the existing 69 kV Orono Substation with an expanded 115 kV <br /> I substation at the same location. The Project would also modify Xcel Energy's existing transmission <br /> line 0831 by replacing a 1,030-foot single-circuit section with a new 1,020- foot single-circuit section. <br /> The Project would install a 2,160-foot segment of new double circuit 115 kV/115 kV transmission <br /> U <br /> line between the Orono Substation and transmission line 0831. The replacement substation will not <br /> have 69 kV transmission equipment;as a result GRE's existing 69 kV Line BD will be re-routed <br /> around the replacement substation (Xcel Energy,June 7,2011). <br /> I3.10 Cost <br /> As provided in the route permit application,transmission line costs would vary depending on the <br /> I structure type,the height and diameter and composition of the structures,the number of structures <br /> per mile,labor and hardware costs. The line construction costs include the cost of structures, <br /> insulators,conductors,and labor as well as any costs of equipment that will be used to construct the <br /> I new line,but do not include right-of-way acquisition costs. Construction costs also include <br /> modifications to the Orono Substation. The estimated project costs are summarized in Table 3. <br /> I <br /> Table 3: Estimated Project Costs <br /> Route Proposed Route Baker Park Reserve <br /> Alternative <br /> New Transmission Line $1.2 million $1.3 million <br /> IOrono Substation Removal and Replacement $4.1 million $4.1 million <br /> Total Project Cost $5.3 million $5.4 million <br /> I <br /> Source:Xcel Energy,June 7,2011;Xcel Energy,personal communication,October 13,2011. <br /> Xcel Energy indicates that operating and maintenance costs for the transmission line will be nominal <br /> I for several years, since the transmission line will be new and would require minimal vegetation <br /> maintenance. Xcel Energy's typical annual operating and maintenance costs, for 115 kV <br /> transmission lines in its Upper Midwest system,incorporating line and inspections,vegetation <br /> I management,and maintenance and repairs as needed, are approximately$300 to$500 per mile of <br /> transmission line right-of-way. Transmission line inspections are typically performed by airplane or <br /> helicopter on a regular basis. Inspections of substations and other equipment are generally <br /> I performed on an annual or semi-annual basis depending on the type of equipment. Maintenance <br /> and repairs to substations are performed on an as-needed basis with costs varying from substation to <br /> substation (Xcel Energy,2011a). <br /> I <br /> I <br /> I <br /> tEnvironmental Assessment <br /> PUC Docket E002/TL-11-223 Page 13 <br />