Laserfiche WebLink
I <br /> I <br /> PERMIT COMPLIANCE FILINGS1 <br /> I <br /> PERMITTEES: Great River Energy <br /> PERMIT TYPE: 115 kV High-Voltage Transmission Line Route Permit <br /> I <br /> PROJECT LOCATION: Hubbard County,Minnesota <br /> PUC DOCKET NUMBER: ET2/TL-10-86 <br /> I <br /> Filing Permit <br /> I <br /> Number Section Description Due Date <br /> 1. 4.2.1 Contact information for field 0 days prior to <br /> I <br /> representative construction <br /> 2. 4.3 Periodic Status Re s Not more than weekly I <br /> m,� <br /> 3. 4.4 Complaint Pro d e Prior to start of construction i <br /> At, First contact with the <br /> 4. 4.5 Notification to Landowners andowners after issuance <br /> of permit I <br /> 30 days before right-of-way <br /> 5. 4.1 : Plan and Profile of„Rig1 o=Wa <br /> I <br /> preparation or construction <br /> 6 �� I Notice of co t e + a date of Three days prior to <br /> placement i 6.service energizing <br /> I <br /> 4 6 Provide As-b : d GPS information Within 60 days of <br /> 7. (ArcGIS files or similar) construction I <br /> 8. 5.1 Avian Mitigation Plan Submit with Plan and <br /> Profile <br /> I <br /> I <br /> I <br /> 1 This compilation of permit compliance filings is provided for the convenience of the Permittee and the I <br /> Commission. However,it is not a substitute for the permit;the language of the permit controls. <br /> Page2of2 I <br />