Laserfiche WebLink
I <br /> I <br /> MINNESOTA PUBLIC UTILITIES COMMISSION <br /> I COMPLIANCE FILING PROCEDURE <br /> FOR PERMITTED ENERGY FACILITIES <br /> I <br /> 1. Purpose <br /> To establish a uniform and timely method of submitting information required by the Commission <br /> Ienergy facility permits. <br /> 2. Scope and Applicability <br /> IThis procedure encompasses all compliance filings required permit. <br /> I3. Definitions <br /> Compliance Filing—A sending(filing) of informatrato the Commission, where the information <br /> Iis required by a Commission site or route permit. <br /> 4. Responsibilities <br /> The Permittees shall eFile all compliance filingswith Dr. Burl Par,Executive Secretary, Public <br /> Utilities Commission,through the Department of Comme : ) eDocket system. The <br /> system is located on the DOC website: https://www.edockets.state: - .us/EFiling/homejsb <br /> I General instructions are %vided on the website. Permittees must register on the website to <br /> P � g <br /> eFile documents _ ��� <br /> All filings muzi,4 ave a coy,.sheet that ='lodes: Illk <br /> I <br /> • Date <br /> • Name of sub itter/Permittee <br /> • Type of permit(Site or Route) <br /> I • Project location <br /> • Project docket number <br /> • Permit section under which the filing is made <br /> I ■ Short description of the filing <br /> Filings that are graphic intensive (e.g.,maps,plan and profile)must, in addition to being eFiled, <br /> I be submitted as paper copies and on CD. Copies and CDs should be sent to: 1) Dr. Burl W. <br /> Haar,Executive Secretary,Minnesota Public Utilities Commission, 121 7thPlace East, Suite 350, <br /> St. Paul,MN, 55101-2147, and 2)Department of Commerce,Energy Facility Permitting, 85 7th <br /> IPlace East, Suite 500, St. Paul,MN, 55101-2198. <br /> I <br /> IPage 1 of 2 <br />