Laserfiche WebLink
I <br /> I <br /> 4.8 Other Requirements. <br /> I <br /> 4.8.1 Applicable Codes <br /> I The Permittee shall comply with applicable requirements of the NESC including <br /> clearances to ground, clearance to crossing utilities, clearance to buildings,right-of-way <br /> widths, erecting power poles,and stringing of transmission line conductors. The <br /> I transmission line facility shall also meet the North American Electric Reliability <br /> Corporation's (NERC)reliability standards. <br /> I 4.8.2 Other Permits <br /> The Permittee shall comply with all applicable state rules and statutes. The Permittee <br /> shall obtain all required local, state and federal permits for the project and comply with <br /> I the conditions of these permits. A list of the required permits s included in the route <br /> permit application and the environmental assessment. The Permittee shall submit a copy <br /> of such permits to the Commission upon request. <br /> I4.8.3 Pre-emption <br /> Pursuant to Minn. Stat. § 216E.10. subd. 1 and 2,this ro..J e permit shall be the sole route <br /> Iapproval required to be obtained by the Permittee and th <,permit shall supersede and <br /> preempt all zoning, building, or land use rules, reg A ± <br />