Laserfiche WebLink
1 <br /> 4.6.3 GPS Data <br /> Within 60 days after completion of construction,the Permittee shall submit to the E <br /> Commission, in the format requested by the Commission, geo-spatial information <br /> (ArcGIS compatible map files, GPS coordinates, associated database of characteristics, <br /> etc.)for all structures associated with the transmission lines, each switch, and each <br /> substation connected. <br /> 4.7 Electrical Performance Standards. ' <br /> 4.7.1 Grounding <br /> The Permittee shall design, construct, and operate the transmission line in a manner that <br /> the maximum induced steady-state short-circuit current shall be limited to five <br /> milliamperes(mA), root mean square (rsm) alternating current between the ground and <br /> any non-stationary object within the right-of-way, including but not limited to large <br /> motor vehicles and agricultural equipment. All fixed metallic objects on or off the right- <br /> of-way, except electric fences that parallel or cross the right-of-way, shall be grounded to <br /> the extent necessary to limit the induced short-circuit current between ground and the <br /> object so as not to exceed one mrms under steady state conditions of the transmission <br /> line and to comply with the ground fault conditions spec ied in the National Electric <br /> Safety Code (NESC).Permittee shall address and r ctify y induced current problems <br /> that arise during transmission line operation. <br /> 4.7.2 Electric Field <br /> The transmission line shall be designed. constructed, and operated in such a manner that <br /> the electri ield measured one meter above ground level immediately below the I <br /> transmi on line shell not exceed_- .0 kVim rms. <br /> 4.7.3 1,erferete with Co umcattbn Devices I <br /> If interferenc with radio or televiz , atellite, wireless interne, GPS-based agriculture <br /> navigation systems or other communication devices is caused by the presence or <br /> operation of the transmission line,the Permittee shall take whatever action is prudently <br /> feasible to restore or provide reception equivalent to reception levels in the immediate <br /> area just prior to the construction of the line. <br /> 1 <br /> 1 <br /> November 2010 Page 1 14 ' <br /> I <br />