Laserfiche WebLink
I <br /> Section 5.0—Details the potential impacts of the proposed project to human and natural I <br /> environments and identifies measures that could be implemented to avoid,minimize or mitigate any <br /> potential adverse impacts. <br /> I <br /> Section 6.0—Lists additional permits that may be required for the proposed project. <br /> Section 7.0—Provides a comparison of the routes analyzed in this EA. <br /> I <br /> Section 8.0—References <br /> I <br /> Much of the information used in this EA is derived from documents prepared by Xcel Energy. <br /> These include Xcel Energy's Route Permit Application for the Orono substation Replacement and New 115 <br /> I <br /> kV Transmission Line Project,June 7,2011,along with the emails and requests for information. <br /> Discussion of electromagnetic field issues came primarily from the white paper developed by the <br /> Interagency Task Force led by the Minnesota department of Health (MDH),the National Institute <br /> for Environmental Health Sciences (NIEHS),and the World Health Organization (WHO). <br /> I <br /> Additional information comes from earlier EFP environmental review documents in similar dockets, <br /> other state agencies such as the Minnesota Department of Natural Resources (MnDNR) and the <br /> Minnesota Pollution Control Agency (MPCA). Section 8.0 provides a listing of additional references <br /> I <br /> used in the preparation of this EA. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Environmental Assessment I <br /> PUC Docket E002/TL-11-223 Page 2 <br /> I <br />