' 1 INTRODUCTION <br /> Xcel Energy (applicant) has made application to the Minnesota Public Utilities Commission <br /> ' (Commission) for a route permit under the alternative permitting process of the Power Plant Siting <br /> Act(Minnesota Statute 216E). The route permit application is for the replacement of the existing <br /> 69 kV Orono Substation with a larger 115 kV substation at the same site and for the construction of <br /> ' approximately 0.4 miles of double circuit 115 kV transmission line,and relocation of approximately <br /> 0.2 miles of single-circuit 115 kV transmission line. <br /> ' Xcel Energy proposes to construct the Orono Substation Expansion and new 115 kV Transmission <br /> Line Project(Project). The Project is located entirely within the city of Orono in Hennepin County. <br /> As proposed,the Project would replace the existing 69 kV Orono Substation with a new 115 kV <br /> ' substation at the same location,but with a larger footprint. The Project would connect the new <br /> substation to the existing Xcel Energy 115 kV transmission line 0831 through a new double circuit <br /> 115 kV transmission lines of approximately 0.4 miles. Xcel Energy also proposes to relocate <br /> ' approximately 0.2 miles single circuit 115 kV transmission line as part of the Project. While not part <br /> of the Route Permit requested by Xcel Energy,approximately 400 feet of the existing Great River <br /> Energy(GRE) 69 kV transmission line BD would be rerouted around the expanded Orono <br /> ' Substation. <br /> Xcel Energy proposes to use steel single-pole structures with spans of approximately 300 to 500 feet <br /> ' between poles;structure heights are anticipated to range from 70 to 90 feet for the single-circuit <br /> structures to 75 to 115 feet for the double-circuit structures. Xcel Energy is requesting a route width <br /> of approximately 400 feet,or 200 feet either side of the proposed alignment shown in the <br /> Application maps. The anticipated right-of-way for the new transmission line would be 75 feet. <br /> Xcel Energy estimates the total Project cost to be approximately$5.3 million dollars. <br /> Energy Facility Permitting(EFP) staff is tasked with conducting environmental review of <br /> applications for high-voltage transmission line route permits. The intent of the environmental <br /> review process is to inform the public,the applicant,and decision-makers about potential impacts <br /> and possible mitigation measures for a proposed high-voltage transmission line project. <br /> This environmental assessment(EA) covers the environmental review requirements in accordance <br /> with the Scoping Decision Document for this EA,and as outlined in Minnesota Rules 7850,for the <br /> ' proposed project and route permit application as follows: <br /> Section 1.0-Introduction <br /> ' Section 2.0—Describes the regulatory framework associated with the project,which includes <br /> information on the certificate of need criteria,route permit requirements,and the alternative <br /> ' permitting processes. <br /> Section 3.0—Provides a detailed description of the Project as proposed by Xcel Energy and the <br /> ' Baker Park Reserve Route Alternative. Alternatives proposed,but not carried forward for detailed <br /> analysis are also described here. <br /> ' Section 4.0—Describes the methods used when constructing the transmission line along with clean- <br /> up and restoration,maintenance procedures,and utility rights-of-way acquisition. <br /> ' Environmental Assessment <br /> PUC Docket E002/TL-11-223 Page 1 <br /> 1 <br />