Laserfiche WebLink
I <br /> I <br /> CONTENTS <br /> 1 ROUTE PERMIT 4 I <br /> 2 PROJECT DESCRIPTION 4 <br /> 1 <br /> 2.1 115 kV High-Voltage Transmission Line 4 <br /> 2.2 Substation 5 <br /> 2.3 Structures & Conductors 5 <br /> I <br /> 3 DESIGNATED ROUTE 7 <br /> 3.1 Route Width and Alignment 7 <br /> 3.2 Right-of-Way Placement 8 <br /> 3.3 Right-of-Way Width 8 <br /> 4 PERMIT CONDITIONS = 9 <br /> I <br /> 4.1 Plan and Profile9 <br /> 4.2 Construction Practices 9 1 <br /> 4.2.1 Field Representative 9 <br /> 4.2.2 Local Governments 10 I 4.2.3 Cleanup £' 10 <br /> ''.:::: <br /> 4.2.4 Noise 10 <br /> 4.2.5 Vegetation Removal in the Right-of-Way 10I <br /> 4.2.6 Aesthetics 10 <br /> 4.2.7 Er"lowCoutrol 11 1 <br /> 4.2.8 ��Vetlands and Water R rces 11 <br /> 4.2:9 haeological and pistoric Resources 12 <br /> 4.2.10 Temrary Work Space y, 12 <br /> I <br /> 4.2.11 R �toration 12 <br /> 4.2.12 Notice of Permit 13 I 4.3 Periodic Status Reports 13 <br /> 4.4 Complaint Procedure 13 <br /> 4.5 Notification to Landowners 13 <br /> I <br /> 4.6 Completion of Construction 13 <br /> 4.6.1 Notification to Commission 13 <br /> I <br /> 4.6.2 As-Builts 13 <br /> 4.6.3 GPS Data 14 I 4.7 Electrical Performance Standards. 14 <br /> 4.7.1 Grounding 14 <br /> 4.7.2 Electric Field 14 1 <br /> 4.7.3 Interference with Communication Devices 14 <br /> November 2010 Page 12 <br /> I <br />