My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Environmental Assessments
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel Substation 2011-2012 - File Cabinet 1
>
Environmental Assessments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:45 PM
Creation date
9/27/2021 2:02:42 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> CONTENTS <br /> 1 ROUTE PERMIT 4 I <br /> 2 PROJECT DESCRIPTION 4 <br /> 1 <br /> 2.1 115 kV High-Voltage Transmission Line 4 <br /> 2.2 Substation 5 <br /> 2.3 Structures & Conductors 5 <br /> I <br /> 3 DESIGNATED ROUTE 7 <br /> 3.1 Route Width and Alignment 7 <br /> 3.2 Right-of-Way Placement 8 <br /> 3.3 Right-of-Way Width 8 <br /> 4 PERMIT CONDITIONS = 9 <br /> I <br /> 4.1 Plan and Profile9 <br /> 4.2 Construction Practices 9 1 <br /> 4.2.1 Field Representative 9 <br /> 4.2.2 Local Governments 10 I 4.2.3 Cleanup £' 10 <br /> ''.:::: <br /> 4.2.4 Noise 10 <br /> 4.2.5 Vegetation Removal in the Right-of-Way 10I <br /> 4.2.6 Aesthetics 10 <br /> 4.2.7 Er"lowCoutrol 11 1 <br /> 4.2.8 ��Vetlands and Water R rces 11 <br /> 4.2:9 haeological and pistoric Resources 12 <br /> 4.2.10 Temrary Work Space y, 12 <br /> I <br /> 4.2.11 R �toration 12 <br /> 4.2.12 Notice of Permit 13 I 4.3 Periodic Status Reports 13 <br /> 4.4 Complaint Procedure 13 <br /> 4.5 Notification to Landowners 13 <br /> I <br /> 4.6 Completion of Construction 13 <br /> 4.6.1 Notification to Commission 13 <br /> I <br /> 4.6.2 As-Builts 13 <br /> 4.6.3 GPS Data 14 I 4.7 Electrical Performance Standards. 14 <br /> 4.7.1 Grounding 14 <br /> 4.7.2 Electric Field 14 1 <br /> 4.7.3 Interference with Communication Devices 14 <br /> November 2010 Page 12 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.