Laserfiche WebLink
I <br /> STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION <br /> ' ROUTE PERMIT FOR CONSTRUCTION OF A HIGH-VOLTAGE TRANSMISSION <br /> LINE AND ASSOCIATED FACILITIES <br /> ' IN HUBBARD COUNTY <br /> ' ISSUED TO <br /> GREAT RIVER ENERGY <br /> PUC DOCKET NO. ET2/TL-10-86 <br /> ' In accordance with the requirements of Minnesota Statutes .pter 216E and Minnesota Rules <br /> Chapter 7850,this route permit is hereby issued to: <br /> ' GREAT RIVER ENER <br /> Great River Energy is authorized by this route permit taco " ct a new 7.25-mile 115 kilovolt <br /> (kV)transmission line between a newly proposed Potato 11 e substation to be constructed in <br /> Arago Township and a tap point on Great River Energy's existing Mantrap Sub Tap 34.5 kV <br /> ' transmission line in Lake Emma Township, Hubbard County, nesota. The new 115 kV <br /> transmission facility line would initially he operated at 34.5 kV til conversion to 115 kV <br /> becomes necessary. <br /> The transmission line and ssoi9 ities shall be built within the route identified in this <br /> permit,as portrayed on th offic s route maps, and in compliance with the conditions specified <br /> in this permit. <br /> • <br /> Approved and adopted the day of Novem rc r, 2010 <br /> BY ORDER OF TICOMMISSION <br /> ' Burl W. Haar, <br /> Executive Secretary <br /> This document can be made available in altemative formats(i.e.,large print or audio)by calling 651.296.0406(voice). Persons <br /> with hearing or speech disabilities may call us through Minnesota Relay at 1.800.627.3529 or by dialing 711. <br />