Orono Substation Replacement and New 115 kV Transmission Line Project <br /> May 2,2012 <br /> Page 2 of 3 <br /> Enclosed for your review and comment are three different design options for <br /> berming/landscaping around the planned Orono Substation, as well as proposed site <br /> plan, fencing, lighting, and noise wall details. <br /> Attached to this letter are the following proposed design documents: <br /> 1. Proposed Site Layout — aerial map indicating proposed project as permitted <br /> by the PUC; <br /> 2. Option 1 — proposed site layout including new landscaping and no berm on <br /> west side of new substation facility(NH-246796-1 Option 1); <br /> 3. Option 2 —proposed site layout including new landscaping and berm on west <br /> side of new substation facility on Xcel Energy property (NH-246796-1 <br /> Option 2); <br /> 4. Option 3 —proposed site layout including new landscaping and berm on Xcel <br /> Energy property and extending west onto Huntington Farm Home Owners <br /> Association property(NH-246796-1 Option 3); <br /> 5. Elevation 1 —elevation view of Option 1 above(NH-11399043-LO1); <br /> 6. Elevation 2—elevation view of Option 3 above(NH-11399043-LO3); <br /> 7. Detail Sheets (3) —indicating proposed lights, lighting locations, fencing, etc. <br /> (NH-11553395); and <br /> 8. Preliminary Plan and Profile of transmission structures and conductors <br /> indicating structure locations,heights, etc. (NH-253583-1). <br /> Xcel Energy will hold a public meeting on May 15, 2012, from 6 to 8 p.m. at the <br /> Orono City Hall, 2750 Kelley Parkway, Orono, MN to discuss the options and <br /> design information, obtain landowner comments and answer any questions <br /> landowners have regarding the Project. If you are not able to attend the meeting, <br /> please provide any comments or questions you have in writing via fax, email or U.S. <br /> Mail to my attention as noted below. All comments must be received by Xcel no later <br /> than June 8, 2012. Xcel Energy will then finalize the Orono Substation replacement <br /> design and provide a final version of the substation design to you once complete. <br /> General Conditions 4.4 and 4.5 require Xcel Energy to provide all affected landowners <br /> with a copy of the Route Permit, the complaints procedures, , and a copy of the <br /> Landowner Guide to Easements (June 3, 2011, Fact Sheet entitled "Rights-of-Way and <br /> Easements for Energy Facility Construction and Operation") publication provided by the <br /> Minnesota Department of Commerce (DOC). Please find attached to this letter a copy of <br /> the Route Permit, the complaints procedures, and the DOC easement publication. <br /> We look forward to your comments on the proposed design of the Orono Substation. <br /> Please review the enclosed materials and feel free to contact me with any questions. <br />