My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EQB & MN Rules
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel Substation 2011-2012 - File Cabinet 1
>
EQB & MN Rules
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:45 PM
Creation date
9/27/2021 11:51:38 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Xcel Energy 414 Nicollet Mall <br /> �Ef��ME1�EE IT MATURE" Minneapolis, Minnesota 55401-1993 <br /> May 2, 2012 <br /> VIA ELECTRONIC FILING AND DELIVERY TO ATTACHED SERVICE LIST <br /> Re: Orono Substation Replacement and New 115 kV Transmission Line Project <br /> Route Permit Compliance Filings <br /> Docket No. E002/TL-11-223 <br /> Dear Property Owner: <br /> On April 6, 2012, the Minnesota Public Utilities Commission (PUC or Commission) <br /> issued Northern States Power Company, a Minnesota corporation (Xcel Energy) a Route <br /> Permit to replace and modify the existing Orono Substation and to construct a new 115 <br /> kV transmission line between the expanded Orono Substation and Xcel Energy's existing <br /> 115 kV transmission Line 0831 in the City of Orono (Project). You are receiving this <br /> letter and enclosed information in compliance with Route Permit General Conditions 4.4 <br /> and 4.5, and Special Condition 5.3. <br /> Special Condition 5.3 provides: <br /> "Within 60 days of the issuance of this permit, the Permittee shall submit a <br /> preliminary design plan for the replacement substation to the Commission, the <br /> city of Orono, the Huntington Farm Home Owners Association, and property <br /> owners of record with properties located south of U.S. Highway 12, west of the <br /> U.S Highway 12/Hennepin County Road 6interchange, and within 2,500 feet of <br /> the proposed fenced area of the replacement substation. <br /> The preliminary design shall include, at a minimum, details concerning the <br /> location of the replacement substation on the site, grading of the site, the size <br /> and type of noise walls to be installed around the transformer location,fencing, <br /> lighting, and landscaping including location and dimension of proposed berms <br /> and vegetation around the replacement substation. <br /> The Permittee shall allow the Commission, the city of Orono, the Huntington <br /> Farm Home Owners Association, and local landowners a minimum of 30 days <br /> to review and provide comments on the preliminary design." <br />
The URL can be used to link to this page
Your browser does not support the video tag.