My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EQB & MN Rules
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel Substation 2011-2012 - File Cabinet 1
>
EQB & MN Rules
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:45 PM
Creation date
9/27/2021 11:51:38 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Installation of two 115 kV line terminations, each with a motor—operated <br /> transmission line switch, one with a quick-break line dropping whip. <br /> • Installation of two single-phase coupling capacitor voltage instrument <br /> transformers with carrier accessories. <br /> • Installation of two 2000 amp line traps and tuners. <br /> • Installation of six 76 kV maximum continuous operating voltage station class <br /> surge arresters.31 <br /> Project Schedule <br /> 29. Xcel Energy stated in their application that they anticipate that construction of the <br /> project would begin in the first quarter of 2012 with a second quarter 2013 in- <br /> service date based on information known as of the date of the route permit <br /> application filing. The schedule may be subject to revision as further information is <br /> developed.32 <br /> Project Cost <br /> 30. Xcel Energy estimates the total cost of the project, including expansion of the <br /> Orono Substation as well as cost of structures, insulators, conductors, labor, and <br /> cost of equipment used to construct the new line to be approximately $5.3 million <br /> for the Xcel Proposed Route and $5.4 million for the Baker Park Reserve Route <br /> Alternative. Project cost does not include right-of-way acquisition costs.33 <br /> 31. Xcel Energy's typical annual operating and maintenance costs, for 115 kV <br /> transmission lines in its Upper Midwest system, incorporating line and inspections, <br /> vegetation management, and maintenance and repairs as needed, are approximately <br /> $300 to $500 per mile of transmission line right-of-way. Transmission line <br /> inspections are typically performed by airplane or helicopter on a regular basis. <br /> Inspections of substations and other equipment are generally performed on an <br /> annual or semi-annual basis depending on the type of equipment. Maintenance and <br /> repairs to substations are performed on an as-needed basis with costs varying from <br /> substation to substation.34 <br /> Procedural Summary <br /> 32. Xcel Energy initially sought local review of the project from the city of Orono and <br /> submitted a conditional use permit to the city on August 20, 2010. Xcel Energy <br /> notified the Commission of its intent to follow the local review process on <br /> September 1, 2010. On December 13, 2010, the Orono City Council voted to refer <br /> 31 Ex. 12 at pp. 17-18(EA),Ex. 17 at Schedule 11 (Sedarski Direct) <br /> 32 Ex.2 at pp. 10-11 (Application) <br /> 33 Ex. 12 at p. 13(EA) <br /> 34 Ibid. <br /> 9 <br />