My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EQB & MN Rules
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel Substation 2011-2012 - File Cabinet 1
>
EQB & MN Rules
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:45 PM
Creation date
9/27/2021 11:51:38 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17, 2011 to allow the relocated transmission line poles to be set at 5 feet south of <br /> BNSF property and for a revised crossing over the railroad.'$ <br /> 17. When the transmission line would be located on private property in areas such as <br /> open fields or scattered forest land, an easement for the entire right-of-way (up to <br /> 75 feet) would be acquired from the affected landowner(s). Xcel Energy anticipates <br /> that approximately 2,270 feet of new right-of-way would need to be acquired to <br /> construct the project.19 <br /> 18. The 866 feet of both routes that is located on the Orono substation site owned by <br /> Xcel Energy would not require acquisition of new right-of-way.20 <br /> Structure Types <br /> 19. Xcel Energy proposes to use a combination of three different structure types. All of <br /> the proposed structures would be single pole structures constructed of galvanized or <br /> weathering steel with heights of between 70 and 115 feet, depending upon the <br /> structure type and location. All structures are anticipated to be self-supporting; <br /> Xcel Energy does not anticipate use of structures requiring guy wires.21 <br /> 20. The majority of the structures, 076-1 to 076-5, would be 115/115 kV double-circuit <br /> structures. Xcel Energy would use single-pole davit arm structures with heights of <br /> 75 to 115 feet and spans of 300 to 500 feet between structures. Under the Baker <br /> Park Preserve Route Alternative two of the structures, 076-1 and 076-2, would be <br /> constructed to support the existing distribution on the north side of U.S. Highway <br /> 12; heights and spans for these underbuild structures would be similar to the main <br /> double-circuit structures.22 <br /> 21. A new single-circuit angle structure, 077, would be installed in the portion of the <br /> line relocating Xcel Energy's existing line 0831. The new structure would be <br /> approximately 70 to 90 feet in height with spans of 300 feet to 500 feet.23 <br /> 22. Single-pole cross Arm Y-frame structures would replace the existing Structure 076, <br /> in Baker Park Reserve, and 078, where Xcel Energy's existing line 0831 would be <br /> relocated.24 The existing 0831 line is constructed primarily with H-frame structures; <br /> use of the Y-frame structures would allow the conductors from the 0831 line to <br /> maintain their configuration in a horizontal plane. <br /> 18 Ex. 17 at p.7(Sedarski Direct) <br /> 19 Ex. 12 at p.9(EA) <br /> 20 Ibid. <br /> 21 Ibid.at pp. 10-11 <br /> 22 Ibid. at p. 11 <br /> 23 Ibid. <br /> 24 Ibid. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.