My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/27/2021 10:59:10 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Phase Ia background research revealed that no archaeological site or inventoried standing <br />structure is recorded within the proposed Project. A total of 34 previously recorded cultural <br />resource properties were located within the proposed Project Area. The site file search identified 15 <br />archaeological sites and 19 inventoried historic architectural properties located within one mile of <br />the Project. The Phase Ia Report in Appendix E provides more information on these sites. <br />Of the 15 archaeological sites, thirteen are pre -contact and consist of. six lithic scatters, two artifact <br />scatters, three single artifact finds, and two Native American earthwork. The remaining two sites <br />consist of post -contact historic structural ruins with associated artifact scatters. None of the <br />previously recorded artifact scatters are listed in the National Register CEF by the SHPO. Of the 19 <br />historic architectural properties none are listed on the National Register of Historic Places <br />("NRHP") or CEF. <br />Based upon these findings, the potential for the Project to impact any undiscovered archaeological <br />site is low because the Project is proposed to be located at the existing Orono Substation site, and <br />along existing transportation corridors or it is located in areas already disturbed by residential and <br />commercial development. However, the URS archaeologist identified one area of concern at the <br />proposed Orono Substation replacement site. The Phase Ia Report recommends that archaeological <br />field surveys be initiated in areas previously undisturbed prior to construction at the Orono <br />Substation replacement site. <br />On April 13, 2011, Xcel Energy submitted a consultation letter with a copy of the Phase Ia Report <br />to the SHPO requesting SHPO written agreement with the Phase Ia Report findings and <br />recommendations for the Project. The SHPO responded by letter on May 12, 2011, and concurred <br />with the conclusions and recommendations of the Phase Ia Report (see Appendix E). The SHPO <br />indicated that a full field survey needs to be performed at two locations within the Project area. <br />Xcel Energy will continue to work with the Minnesota SHPO to determine the appropriate next <br />steps for the Project. <br />Mitigative Measures <br />As determined in the Phase Ia Report, no property listed or eligible for listing on the NRHP or the <br />Minnesota Register of Historic Sites is located at or near the Project. However, several previously <br />recorded cultural resource properties were located within one mile of the proposed Project area, and <br />surveys are recommended for specific previously undisturbed Project locations. Xcel Energy <br />implement the SHPO recommendations and will continue to work with the SHPO regarding <br />possible impacts from the Project. <br />If there is an unanticipated discovery of cultural resources during Project construction, Xcel Energy <br />will stop construction activities and consult with a professional archaeologist and the Minnesota SHPO <br />to determine the proper course of action. If a cultural item or feature is determined to be potentially <br />eligible for listing on the NRHP, it will be avoided or mitigated before construction resumes. <br />6.5 Natural Environment <br />6.5.1 Air Quality <br />Potential air quality effects related to transmission facilities include fugitive dust emissions during <br />construction, exhaust emissions from construction equipment, and ozone generation during <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.