Laserfiche WebLink
Mitigative Measures <br />No forest or commercial logging impacts from the Project are expected. Therefore, no mitigative <br />measures are proposed. <br />6.3.3 Tourism <br />Primary tourism activities in the region include camping, recreational use of the regions lakes for <br />fishing and boating, bicycling, cross country skiing and hunting on private lands. The Baker Park <br />Reserve is the only park in the immediate area of the Project that could be considered a tourist area. <br />However, the proposed Project does not cross any lands owned or used by the park (see Figures <br />B.2 and B.7 in Appendix B). Besides Baker Park Reserve, areas west and north of the Project are <br />primarily rural residential and agricultural. Areas south and east of the Project are primarily rural <br />and urban residential. <br />Mitigative Measures <br />No effects on tourism are anticipated from the Project. Therefore, no mitigative measures are <br />proposed. <br />6.3.4 Mining <br />According to MnDOT county pit maps for Hennepin County, there is one inactive gravel pit located <br />approximately four miles east of the Project site. Because no existing gravel and rock resources are <br />being utilized within or near the Project site or proposed transmission line route, no impacts are <br />anticipated. Unknown resources that may exist near the Project would be situated in close proximity <br />to existing transportation rights-of-way, making development of mining resources unlikely. <br />Mitigative Measures <br />No effects on mining are expected from the Project. Therefore, no mitigative measures are <br />proposed. <br />6.4 Archaeological and Historic Resources <br />In response to an Xcel Energy request for comment, the Minnesota State Historic Preservation <br />Office ("SHPO") commented on the proposed Project in a letter dated October 21, 2010 (see <br />Appendix C.7). The SHPO requested that an archaeological survey for the Project be completed <br />prior to the beginning of construction activities. <br />To further assess the potential for archaeological and historic resources to be present near the <br />Project, Xcel Energy engaged URS Corporation ("URS") to conduct a Phase Ia background <br />research/literature review for the proposed Project and prepared a Phase Ia Report. A copy of the <br />Phase 1a Report has been included with this Application as Appendix E. Portions of the Phase Ia <br />report have been omitted due to information considered confidential and not readily available to the <br />general public. URS reviewed previously recorded cultural resource properties at the SHPO. In <br />addition, historical maps, historic aerial photographs, and additional online resources were used to <br />review the recent cultural and environmental history of Project site. <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 51 <br />