(MED GRE) substations. The Project includes removal of the 69 kV termination structure and <br />associated foundations. <br />On the distribution portion of the Orono Substation project, the proposed replacement consists of: <br />• a 115 kV motor -operated disconnect switch and switch stand for the transformer high <br />side disconnect and a 115 kV, 1200A, 40kA circuit switcher; <br />• a 118-14.3 kV, 28 MVA., load tap changing ("LTC") transformer with oil containment, <br />high -side, and low -side station class surge arresters; <br />• a single-phase 13.8 kV potential transformer ("PT") (8400-120 volt); <br />• one 50 kVA preferred station auxiliary transformer and associated equipment; <br />• one 35 kV transformer -low -side box -structure to accommodate switches and conductor; <br />• strain bus to connect the transformer low -side box structure to a second box structure <br />next to existing switchgear in its current location; and <br />• one Electrical Equipment Enclosure ("EEE") with control panels, batter, charger, PLC, <br />terminal cabinets, furniture, heaters, AC & DC cabinets and lighting. <br />The distribution portion of the replacement work also includes all grounding, trenching, controls, <br />telephone and telephone protection, and control cable. Emergency station auxiliary power would be <br />sourced from local distribution. <br />4.4.2 Transmission Structures 076, 077 and 078 (Existing) <br />Transmission Structures 076, 077 and 078 will require replacement for the Project to accommodate <br />the new line configuration of transmission Line 0831 and connection to the planned replacement of <br />the Orono Substation (see Figure 4 and Appendix B, Figure B-2). Structure 076 is located within <br />Baker Park Reserve and it will need to be replaced in order to transition the conductors from a <br />horizontal configuration to a vertical configuration at the new double circuit structure (replacement <br />of existing Structure 077) that will provide the in -out connection to the proposed new Orono <br />Substation. <br />For the Proposed Route the existing Structure 077 will be removed and replaced with a new single <br />pole galvanized steel or weathering steel structure in a new location located north of its existing <br />location, off residential property and onto HFA land located adjacent to the BNSF railroad (see <br />Figure 2 and Appendix B, Figure B-2). The new structure will be renumbered as Structure 076-1. <br />As indicated above, the existing Structure 077 will be removed. A new single pole galvanized steel <br />or weathering steel structure will be installed northwest of the new Structure 076-1 and be located <br />on HFA land adjacent to BNSF railroad right-of-way (see Figure 2 and Appendix B, Figure B-2). <br />This new structure will be numbered Structure 077. <br />Existing Structure 078 is located west of existing Structure 077 on HFA land. Similar to Structure <br />076, Structure 078 will need to be replaced to transition the conductors from a horizontal <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 19 <br />