Laserfiche WebLink
Route. Additionally, Alternative Route 4 requires crossing the BNSF railroad, the Metropolitan <br />Council sewer line and U.S. Highway 12 unlike the Proposed Route. <br />4.4 Associated Facilities and Substation Modifications <br />The associated facilities for the Project include a replacement of the existing 69 kV Orono <br />Substation with a larger 115 kV substation, where the proposed new 115 kV transmission line will <br />begin on the southeast end of the Project, reconfiguring Line 0831 and replacement of transmission <br />Structures 076, 077 and 078. No additional fee land purchase is anticipated for the replacement of <br />the existing Orono Substation. <br />4.4.1 Orono Substation (Replacement) <br />The existing Orono Substation is located at 3960 6th Avenue North, Orono, Hennepin County, <br />Minnesota, on a 16 -acre site owned by Xcel Energy, approximately 900 feet west of the intersection <br />of U.S. Highway 12 and County Road 6. It is approximately one mile east of the City of Maple Plain <br />municipal boundaries (see Figure B-3 in Appendix B). The existing Orono Substation is a 69-13.8 <br />kV distribution substation that will be partially demolished and replaced with a new 115-13.8 kV <br />distribution substation (see Appendix B, Figure B-10). All of the substation replacement will be <br />located within existing Xcel Energy property at the 16 -acre site and will encompass the site of the <br />existing 69 kV substation. <br />The existing switchgear will be reused in the proposed new substation. The existing substation will <br />remain energized until the existing switchgear enclosure in its current location can be energized from <br />the new 115 kV source. During construction a feeder field ties with ORO62 and a mobile <br />substation with associated equipment will be installed to ensure continuity of service for the 17 <br />MVA load before the switchgear enclosure is switched to the new 115 kV source. <br />On the transmission portion of the Orono Substation project, the proposed replacement consists of: <br />• a new 115-13.8 kV substation with a 28 mega volt ampere ("MVA"), 118-14.3 kV <br />transformer; <br />• two 115 kV line terminations, each with a motor -operated transmission line switch with <br />a quick -break line dropping whip; <br />• one single-phase coupling capacitors voltage transformers ("CCTVs") with carrier <br />accessories; <br />• a 2000 amp ("A") wave trap with line tuner; and <br />• three 76 kV maximum continuous operating voltage ("MCOV") station class surge <br />arresters. <br />The transmission portion of the replacement work also includes all bus (all 115 kV bus will be sized <br />for a minimum 2000A capacity), cable, controls and relaying, steel, trenching, applicable setbacks, <br />stormwater ponds, grading, foundations, fencing, new and existing rights-of-way for the <br />transmission line and transmission line termination structures. Xcel Energy will coordinate with <br />GRE to modify the 115 kV remote end relay settings at both Crow Rivers (CRO GRE) and Medina <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 18 <br />