Laserfiche WebLink
Table 4 <br />Detailed Description of Proposed Route <br />. ' . ute Distanc <br />A&mm"rn-ging <br />Road . Public Waters <br />LL... <br />a mai <br />A <br />Orono Substation to existing Xcel Energy 115 kV Line 0831 south <br />of U.S. Highway 12 (2,600 feet west of Orono Substation) <br />North out of proposed new substation on Xcel <br />Energy property (double circuit on proposed <br />100 feet <br />No features crossed <br />Structure 076-4)) <br />Northwest to Xcel Energy's west property line <br />(double circuit on proposed Structures 076-4 <br />-)11 fcct <br />No features crossed <br />and 076-3) <br />North along Xcel Energy's west property line <br />to just south of BNSF right-of-way (double <br />455 feet <br />Unnamed Wetland <br />circuit on proposed Structures 076-3 to 076-2 <br />Northwest across HFA land and paralleling <br />BNSF right-of-way to proposed Structure 076- <br />1,205 feet <br />Unnamed Wetland <br />1 (double circuit on proposed Structures 076-2 <br />and 076-1) <br />Northwest paralleling BNSF right-of-way <br />(single circuit on proposed Structures 076-1 <br />590 feet <br />Painter Creek <br />and new 077 <br />Southwest (single circuit on proposed new <br />475 feet <br />Unnamed Wetland <br />Structures 077 and 078) <br />Total Length <br />3,136 feet <br />There are no residences located within 200 feet of the Proposed Route centerline (see Section 6.2.2). <br />A total of 34 cultural resource sites are located within one mile of the Proposed Route, including 15 <br />archaeological sites and 19 historic architectural properties. None of the 15 archaeological sites are <br />listed on the National Register Considered Eligible Finding ("CEF"). Of the 19 architectural <br />properties, none listed or eligible for listing on the National Register of Historic Places ("NRHP") <br />(see Section 6.4). The historic character of the architectural properties will not be affected by the <br />Proposed Route nor does the Proposed Route cross any of the 15 archaeological sites. The <br />Proposed Route does cross any three Public Waters Inventory ("PWI") watercourses or <br />waterbodies. Of the PWIs crossed, Painter Creek will be crossed by the Proposed Route just prior <br />to or after proposed the connection to Structure 077 depending on final placement of this Structure. <br />The Proposed Route will also cross two PWI wetlands (Unnamed (27-917-W and 27-916-W). These <br />two wetlands appear to have been connected prior to the development of the HFA properties. The <br />Proposed Route will span approximately 2,135 feet of wetland (see Section 6.5.4). <br />4.2 Route Width and Alignment Selection Process <br />4.2.1 Route Width <br />The PPSA, Minn. Stat. Chapter 216E, directs the Commission to locate transmission lines in a <br />manner that "minimize[s] adverse human and environmental impact while ensuring continuing <br />electric power system reliability and integrity and ensuring their electric needs are met and fulfilled in <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 13 <br />