Laserfiche WebLink
1 <br /> 1 <br /> wetland, respectively. The Proposed Route will affect approximately 2 acres more of <br /> wetlands than Alternative Route 2 assuming a 75-foot-wide route width in each route; <br /> • Except for replacing existing transmission Structure 076 which is located within existing ' <br /> right-of-way on Baker Park Reserve property, the Proposed Route is outside of the <br /> Baker Park Reserve property. Three of the four Alternative Routes enter the Baker Park <br /> Reserve Property and would require new right-of-way, creating new impacts; ' <br /> • Except for the existing Line 0831 conductors, the Proposed Route does not cross the <br /> BNSF railroad,U.S. Highway 12 or the Metropolitan Council's sewer line,however three <br /> of the four Alternative Routes cross these infrastructures;and <br /> • Xcel Energy is in discussions with two private landowners to move the portion of <br /> existing Line 0831, that is on their respective residential properties, north onto HFA <br /> land. Relocating this portion of Line 0831 is only associated with the Proposed Route. <br /> None of the Alternative Routes would relocate existing transmission facilities off <br /> residential property. <br /> i <br /> 1 <br /> Orono Project June 7,2011 I <br /> MPUC Docket No. E002/TL-11-223 64 <br />