1 <br /> The Phase Ia background research revealed that no archaeological site or inventoried standing ' <br /> structure is recorded within the proposed Project. A total of 34 previously recorded cultural <br /> resource properties were located within the proposed Project Area. The site file search identified 15 <br /> archaeological sites and 19 inventoried historic architectural properties located within one mile of <br /> the Project. The Phase Ia Report in Appendix E provides more information on these sites. <br /> Of the 15 archaeological sites, thirteen are pre-contact and consist of: six Ethic scatters, two artifact , <br /> scatters, three single artifact finds, and two Native American earthwork. The remaining two sites <br /> consist of post-contact historic structural ruins with associated artifact scatters. None of the <br /> previously recorded artifact scatters are listed in the National Register CEF by the SHPO. Of the 19 ' <br /> historic architectural properties none are listed on the National Register of Historic Places <br /> ("NRHP") or CEF. <br /> Based upon these findings, the potential for the Project to impact any undiscovered archaeological <br /> site is low because the Project is proposed to be located at the existing Orono Substation site, and <br /> along existing transportation corridors or it is located in areas already disturbed by residential and <br /> commercial development. However, the URS archaeologist identified one area of concern at the <br /> proposed Orono Substation replacement site. The Phase Ia Report recommends that archaeological <br /> field surveys be initiated in areas previously undisturbed prior to construction at the Orono <br /> Substation replacement site. <br /> On April 13, 2011,Xcel Energy submitted a consultation letter with a copy of the Phase Ia Report <br /> to the SHPO requesting SHPO written agreement with the Phase Ia Report findings and <br /> recommendations for the Project. The SHPO responded by letter on May 12, 2011, and concurred <br /> with the conclusions and recommendations of the Phase la Report (see Appendix E). The SHPO <br /> indicated that a full field survey needs to be performed at two locations within the Project area. ' <br /> Xcel Energy will continue to work with the Minnesota SHPO to determine the appropriate next <br /> steps for the Project. <br /> Mitigative Measures <br /> As determined in the Phase Ia Report, no property listed or eligible for listing on the NRHP or the <br /> Minnesota Register of Historic Sites is located at or near the Project. However, several previously <br /> recorded cultural resource properties were located within one mile of the proposed Project area,and <br /> surveys are recommended for specific previously undisturbed Project locations. Xcel Energy <br /> implement the SHPO recommendations and will continue to work with the SHPO regarding <br /> possible impacts from the Project. <br /> If there is an unanticipated discovery of cultural resources during Project construction,Xcel Energy , <br /> will stop construction activities and consult with a professional archaeologist and the Minnesota SHPO <br /> to determine the proper course of action. If a cultural item or feature is determined to be potentially <br /> eligible for listing on the NRHP,it will be avoided or mitigated before construction resumes. ' <br /> 6.5 Natural Environment <br /> 6.5.1 Air Quality <br /> Potential air quality effects related to transmission facilities include fugitive dust emissions during <br /> construction, exhaust emissions from construction equipment, and ozone generation during <br /> Orono Project June 7, 2011 ' <br /> MPUC Docket No. E002/TL-11-223 52 <br />