Laserfiche WebLink
Mitigative Measures <br /> No forest or commercial logging impacts from the Project are expected. Therefore, no mitigative <br /> measures are proposed. <br /> 6.3.3 Tourism <br /> ' Primary tourism activities in the region include camping, recreational use of the regions lakes for <br /> fishing and boating, bicycling, cross country skiing and hunting on private lands. The Baker Park <br /> Reserve is the only park in the immediate area of the Project that could be considered a tourist area. <br /> ' However, the proposed Project does not cross any lands owned or used by the park (see Figures <br /> B.2 and B.7 in Appendix B). Besides Baker Park Reserve, areas west and north of the Project are <br /> primarily rural residential and agricultural. Areas south and east of the Project are primarily rural <br /> ' and urban residential. <br /> Mitigative Measures <br /> No effects on tourism are anticipated from the Project. Therefore, no mitigative measures are <br /> proposed. <br /> 6.3.4 Mining <br /> According to MnDOT county pit maps for Hennepin County,there is one inactive gravel pit located <br /> ' approximately four miles east of the Project site. Because no existing gravel and rock resources are <br /> being utilized within or near the Project site or proposed transmission line route, no impacts are <br /> anticipated. Unknown resources that may exist near the Project would be situated in close proximity <br /> ' to existing transportation rights-of-way,making development of mining resources unlikely. <br /> Mitigative Measures <br /> ' No effects on mining are expected from the Project. Therefore, no mitigative measures are <br /> proposed. <br /> ' 6.4 Archaeological and Historic Resources <br /> In response to an Xcel Energy request for comment, the Minnesota State Historic Preservation <br /> ' Office ("SHPO") commented on the proposed Project in a letter dated October 21, 2010 (see <br /> Appendix C.7). The SHPO requested that an archaeological survey for the Project be completed <br /> prior the beginning of constructiviti <br /> ' To furthtoer assessnnthe potential for <br /> on arcahaeol <br /> es.ogical and historic resources to be present near the <br /> Project, Xcel Energy engaged URS Corporation ("URS") to conduct a Phase Ia background <br /> ' research/literature review for the proposed Project and prepared a Phase Ia Report. A copy of the <br /> Phase 1a Report has been included with this Application as Appendix E. Portions of the Phase Ia <br /> report have been omitted due to information considered confidential and not readily available to the <br /> ' general public. URS reviewed previously recorded cultural resource properties at the SHPO. In <br /> addition, historical maps, historic aerial photographs, and additional online resources were used to <br /> review the recent cultural and environmental history of Project site. <br /> ' Orono Project June 7,2011 <br /> MPUC Docket No. E002/TL-11-223 51 <br />