1 <br /> ' (MED GRE) substations. The Project includes removal of the 69 kV termination structure and <br /> associated foundations. <br /> ' On the distribution portion of the Orono Substation project,the proposed replacement consists of: <br /> • a 115 kV motor-operated disconnect switch and switch stand for the transformer high <br /> side disconnect and a 115 kV, 1200A,40kA circuit switcher; <br /> • a 118-14.3 kV, 28 MVA., load tap changing ("LTC") transformer with oil containment, <br /> ' high-side, and low-side station class surge arresters; <br /> • a single-phase 13.8 kV potential transformer ("PT") (8400-120 volt); <br /> ' • one 50 kVA preferred station auxiliary transformer and associated equipment; <br /> ' • one 35 kV transformer-low-side box-structure to accommodate switches and conductor; <br /> • strain bus to connect the transformer low-side box structure to a second box structure <br /> next to existing switchgear in its current location;and <br /> • <br /> ' • one Electrical Equipment Enclosure ("EEE") with control panels, batter, charger, PLC, <br /> terminal cabinets, furniture,heaters,AC &DC cabinets and lighting. <br /> The distribution portion of the replacement work also includes all grounding, trenching, controls, <br /> telephone and telephone protection, and control cable. Emergency station auxiliary power would be <br /> sourced from local distribution. <br /> 4.4.2 Transmission Structures 076, 077 and 078(Existing) <br /> ' Transmission Structures 076, 077 and 078 will require replacement for the Project to accommodate <br /> the new line configuration of transmission Line 0831 and connection to the planned replacement of <br /> the Orono Substation (see Figure 4 and Appendix B, Figure B-2). Structure 076 is located within <br /> Baker Park Reserve and it will need to be replaced in order to transition the conductors from a <br /> horizontal configuration to a vertical configuration at the new double circuit structure (replacement <br /> of existing Structure 077) that will provide the in-out connection to the proposed new Orono <br /> Substation. <br /> For the Proposed Route the existing Structure 077 will be removed and replaced with a new single <br /> ' pole galvanized steel or weathering steel structure in a new location located north of its existing <br /> location, off residential property and onto HFA land located adjacent to the BNSF railroad (see <br /> Figure 2 and Appendix B,Figure B-2).The new structure will be renumbered as Structure 076-1. <br /> As indicated above, the existing Structure 077 will be removed. A new single pole galvanized steel <br /> or weathering steel structure will be installed northwest of the new Structure 076-1 and be located <br /> ' on HFA land adjacent to BNSF railroad right-of-way (see Figure 2 and Appendix B, Figure B-2). <br /> This new structure will be numbered Structure 077. <br /> Existing Structure 078 is located west of existing Structure 077 on HFA land. Similar to Structure <br /> ' 076, Structure 078 will need to be replaced to transition the conductors from a horizontal <br /> ' Orono Project June 7,2011 <br /> MPUC Docket No. E002/TL-11-223 19 <br />