I <br /> I <br /> Route. Additionally, Alternative Route 4 requires crossing the BNSF railroad, the Metropolitan I <br /> Council sewer line and U.S. Highway 12 unlike the Proposed Route. <br /> 4.4 Associated Facilities and Substation Modifications <br /> The associated facilities for the Project include a replacement of the existing 69 kV Orono <br /> Substation with a larger 115 kV substation, where the proposed new 115 kV transmission line will <br /> begin on the southeast end of the Project, reconfiguring Line 0831 and replacement of transmission <br /> Structures 076, 077 and 078. No additional fee land purchase is anticipated for the replacement of <br /> the existing Orono Substation. <br /> 4.4.1 Orono Substation (Replacement) <br /> The existing Orono Substation is located at 3960 6th Avenue North, Orono, Hennepin County, I <br /> Minnesota, on a 16-acre site owned by Xcel Energy, approximately 900 feet west of the intersection <br /> of U.S. Highway 12 and County Road 6. It is approximately one mile east of the City of Maple Plain <br /> municipal boundaries (see Figure B-3 in Appendix B). The existing Orono Substation is a 69-13.8 <br /> kV distribution substation that will be partially demolished and replaced with a new 115-13.8 kV <br /> distribution substation (see Appendix B, Figure B-10). All of the substation replacement will be <br /> located within existing Xcel Energy property at the 16-acre site and will encompass the site of the <br /> existing 69 kV substation. <br /> The existing switchgear will be reused in the proposed new substation. The existing substation will <br /> remain energized until the existing switchgear enclosure in its current location can be energized from <br /> the new 115 kV source. During construction a feeder field ties with OR062 and a mobile <br /> substation with associated equipment will be installed to ensure continuity of service for the 17 <br /> MVA load before the switchgear enclosure is switched to the new 115 kV source. <br /> On the transmission portion of the Orono Substation project,the proposed replacement consists of: <br /> • a new 115-13.8 kV substation with a 28 mega volt ampere ("MVA"), 118-14.3 kV <br /> transformer; <br /> • two 115 kV line terminations, each with a motor-operated transmission line switch with <br /> a quick-break line dropping whip; <br /> • one single-phase coupling capacitors voltage transformers ("CCTVs") with carrier <br /> accessories; <br /> • a 2000 amp ("A") wave trap with line tuner;and I <br /> • three 76 kV maximum continuous operating voltage ("MCOV") station class surge <br /> arresters. <br /> The transmission portion of the replacement work also includes all bus (all 115 kV bus will be sized <br /> for a minimum 2000A capacity), cable, controls and relaying, steel, trenching, applicable setbacks, <br /> stormwater ponds, grading, foundations, fencing, new and existing rights-of-way for the <br /> transmission line and transmission line termination structures. Xcel Energy will coordinate with <br /> GRE to modify the 115 kV remote end relay settings at both Crow Rivers (CRO GRE) and Medina <br /> Orono Project June 7, 2011 <br /> MPUC Docket No. E002/TL-11-223 18 <br />