Laserfiche WebLink
Xcel Energy' <br /> Yt41U MSIDtr YY NAiIl Nf' <br /> 414 Nicollet Mall <br /> Minneapolis, Minnesota 66401-1993 <br /> ' September 23, 2010 <br /> [Name] <br /> (Address] <br /> RE: Request for Comments of Proposed Orono Substation Expansion and <br /> ' New 115kV Transmission Line Project <br /> City of Orono Zoning Application#10-3486 <br /> PUC Docket No.E002/LR-10-957 <br /> ' Dear [Name]: <br /> Northern States Power Company,a Minnesota corporation(Xcel Energy), is requesting a Conditional <br /> Use Permit(CUP) from the City of Orono to expand the existing Orono Substation and construct a new <br /> 115 kilovolt(kV)transmission tine to connect the expanded substation to an existing Xcel Energy <br /> 115kV transmission Line 0831 (see Figure 1). The expansion and upgrade will include a complete <br /> rebuild of the existing substation,an increase in operating voltage from 691cV to 115kV, and a new <br /> 115kV transmission line(Project). Attached is a fact sheet with additional Project information. <br /> ' The purpose of this letter is to request your comments on the Project and on the scope of the <br /> Environmental Assessment(EA)that will be prepared for the Project. The EA is required as part of the <br /> ' approval process for the Project. A draft of the table of contents of the EA is attached for your reference. <br /> The EA will address items listed in the attachment. Should you have other questions,comments or <br /> suggestions regarding the contents of the EA,please provide those to me at the address indicated below. <br /> ' The following provides further information regarding the Project. <br /> Orono Substation <br /> The Orono Substation is located at 3960 Sixth Avenue North, Orono, Hennepin County,MN 55356. <br /> The Project site consists of approximately 16 acres and is located in the SW 1/4 of the SW1/4 of Section <br /> 29 and the NW 1/4 of the NW '/ of Section 32,Township 118 North,Range 23 West. The Project area is <br /> ' bounded by State Highway 12 (Wayzata Boulevard) and the Burlington Northern Santa Fe Railroad to <br /> the north, County Road 6(6th Avenue North)to the south and east,with a residential property boundary <br /> to the west. The property contains an existing substation in the southwest corner of the property that is <br /> ' surrounded by open meadow with scattered trees. The remainder of the property is comprised of <br /> wetland.Adjacent land use consists of large-lot,single-family homes to thewest and south,wetland to <br /> the north,and a highway interchange to the east. <br /> ' Project Need <br /> The Project is needed to increase system reliability and reduce the risk of overloads. The increase in <br /> ' voltage from 69kV to 115kV is needed to improve local reliability and to allow for additional load <br /> growth in the future. <br />