Laserfiche WebLink
I <br /> 3 DESIGNATED ROUTE <br /> IThe approved route is shown on the official route maps attached to this permit and further <br /> designated as follows: <br /> IThe transmission line route exits the new Potato Lake Substation in Section 21 of Arago <br /> Township along U.S. Highway 71 and proceeds south paralleling U.S. Highway 71 for <br /> Iapproximately 1.5 miles to 230th Street(Northern Pine Road); east along 230th Street for <br /> approximately 1.5 miles to 141st Avenue; south approximately 1 mile along 141st Avenue to <br /> County Highway 18;then east paralleling County Highway 18 for approximately 3.25 miles to <br /> County Highway 4 and a new three-way switch on the existing Mantrap Sub Tap 34.5 kV line in <br /> I both section five of Henrietta Township and section 32 of La e Emma Township along County <br /> Highway 4. <br /> • <br /> I 3.1 Route Width and Alignment it�. <br /> 44/ <br /> The designated route will be limited to 300 feet in width as dep led on the attached Official <br /> Route Maps. This width will provide the Permittee wi 1 fle , f ility for minor adjustments of the <br /> Ispecific alignment or right-of-way to accom date Jan.. er requests and unforeseen <br /> conditions. The final alignment(i.e.,permanent and maintained rights-of--way)will be located <br /> within this designated route unless otherwise authorized below. <br /> I The designated route, as shown on t a o an <br /> P p alignment d aerial hpates ali nment that would <br /> follow two to five feet outside= xisting road rights-of-way (Coup ighway 4, County Highway <br /> I <br /> 18, 141st Street, 230th Street and U.S.Highway 71) eplace distribution structures and follow <br /> Itasca-Mantrap's existing, istribution line right-of °.y ng .. Highway 71, and that <br /> minimizes the overa, ,• tial impacts relating to th- .ct` ,� dentified in Minn. R. 7850.4100, <br /> 1 as evaluated in the enviro '. - -1 review and pe _ -.t ocesses. Consequently,this permit <br /> anticipates that the actual right-of-way will generally conform to this alignment unless changes <br /> • <br /> are requested by individual landowner 'untoreseen conditions are encountered, or are otherwise <br /> I provided for by this permit. Any alignment mo "ications within this designated route shall be <br /> located so as to have comparable overall impadIE relative to the factors in Minn. R. 7850.4100 as <br /> does the alignment identified in this permit, and shall be specifically identified in, and approved <br /> Ias,part of the Plan and Profile submitted pursuant to Part 4.1 of this permit. <br /> Route width variations outside the designated route may be allowed for the Permittee to <br /> I overcome potential site specific constraints. These constraints may arise from any of the <br /> following: <br /> I 1) Unforeseen circumstances encountered during the detailed engineering and design <br /> process. <br /> I2) Federal or state agency requirements. <br /> 3) Existing infrastructure within the transmission line route, including but not limited to <br /> I roadways, railroads,natural gas and liquid pipelines, high voltage electric transmission <br /> lines, or sewer and water lines. <br /> INovember 2010 Page 17 <br />