Laserfiche WebLink
1 ROUTE PERMIT <br /> The Minnesota Public Utilities Commission(Commission)hereby issues this route permit to <br /> Great River Energy(Permittee)pursuant to Minn. Stat. § 216E.03 and Minn. R. Chapter 7850. <br /> This permit authorizes the Permittee to construct approximately 7.25 miles of new 115 kV <br /> transmission line and associated facilities in Hubbard County, Minnesota and as identified in the <br /> attached Route Permit Maps, hereby incorporated into this document. <br /> 2 PROJECT DESCRIPTION <br /> The Permittee is authorized to construct a project comprising a 7.25-mile transmission line and <br /> Potato Lake Substation as described in the Route Permit App ' ation and evaluated in the <br /> Environmental Assessment. The approved route is shown the Route Permit Maps attached to <br /> this permit and further designated as described. i <br /> 2.1 115 kV High-Voltage Transmission Line <br /> The 115 kV transmission line route would be'locate® s• east of the city of Park Rapids in <br /> Hubbard County, Minnesota. The project_woul•r.peci4µally be located in sections of Arago, <br /> Lake Emma, Todd, and Henrietta townshi <br /> Project Location Data ' <br /> County Township Township Range Sections <br /> Name <br /> Arago 141 N 35 W 21,22,26,27,28,34,35,36 <br /> Henrietta 140 N 34 W 5,6 <br /> Hubb' <br /> \,Lakes ma 141 N 34 W 31,32 <br /> add 140N 35W 1,2 <br /> The Route is 7.25 miles of new overhead 115 kV transmission line between the new Potato Lake <br /> Substation in section 21 of Arago Township and a tap point on GRE's existing Mantrap Sub Tap <br /> 34.5 kV line in both section five of Henrietta Township and section 32 of Lake Emma Township. <br /> November 2010 Page 1 4 <br /> I <br />