Laserfiche WebLink
I <br /> I <br /> 4.8 Other Requirements 15 <br /> 1 4.8.1 Applicable Codes 15 <br /> 4.8.2 Other Permits 15 <br /> I 4.8.3 Pre-emption 15 <br /> 4.8.4 Delay in Construction 15 <br /> 5 SPECIAL CONDITIONS 16 <br /> I <br /> 5.1 Avian Mitigation Plan for Potato River Crossing 16 <br /> 5.2 Blanding's Turtle 16 <br /> 1 6 PERMIT AMENDMENT 17 <br /> 7 TRANSFER OF PERMIT 17 <br /> 8 REVOCATION OR SUSPENSION OF THE PERMIT, 17 <br /> I <br /> IFIGURES <br /> Figure 1 —Overview Proposed Route <br /> Figures 2 A-F—Proposed Route <br /> ATTACHMENTS <br /> I Minnesota Public Utilities Co41- • +mplaint Handling Procedures for High-Voltage <br /> Transmission Lines �% <br /> Minnesota Public Utilities Commision Comp,bance FiImng 1rocedures for Permitted Energy <br /> I Facilities <br /> F <br /> I 4, <br /> I <br /> I <br /> I <br /> I <br /> I <br /> INovember 2010 Page 13 <br /> I <br />