My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono Substation Expansion - Enviromental Assessment (1)
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono Substation Expansion - Enviromental Assessment (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/23/2021 2:52:01 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 SPECIAL CONDITIONS <br /> The Permittee shall provide a report to the Commission as part of the Plan and Profile <br /> submission that describes the actions taken and mitigative measures developed regarding the <br /> Project and the following Special Conditions. <br /> Avian Mitigation Plan for Potato River Crossing <br /> 5.1 � � <br /> The Permittee will prepare an Avian Mitigation Plan to identify potential issues that may pose a <br /> risk to avian species or their habitats at the Potato River crossing and other public waters along <br /> the route. The Permittee will develop strategies in an Avian Mitigation Plan that will be <br /> implemented to avoid or minimize impacts to birds or their habitats at this crossings. Among <br /> other elements,the Plan shall require the Permittee to use lar• swan type bird diverters. The <br /> Permittee shall coordinate the number and spacing of the •' erte with the MnDNR. The <br /> Permittee is to consult with the MnDNR and U.S. Fish a` ',Wife ervice(USFWS) in <br /> developing the Plan. The Plan shall include strategies to en c truction activities are <br /> scheduled to avoid disturbing normal eagle breedi eeding, eltering behavior,as <br /> necessary. The Permittee shall ensure the project` n ns Oth the requirements of the Bald <br /> and Golden Eagle Protection Act in consultation w.-'' th SFWS. The Avian Mitigation Plan <br /> will be submitted to the Commission for approval, ith the Plan and Profile for the Project. <br /> The Permittee's standard transmission design shall equate spacing of conductor(s) i <br /> and grounding devices in accordance with Avian Power L. action Committee (APLIC) <br /> standards to eliminate the risk of electrocution to raptors with lar wingspans that may <br /> simultaneously come in contact with a conductor an ounding devices. 1 <br /> 5.2 Blanding's Turtle <br /> The Permittee shall follow measures and re o n a s for avoiding and minimizing impacts <br /> to Blanding's turtle populations as outl. • se nesota Department of Natural Resources <br /> Division of Ecological Resources Envi •nment• 'eview Fact Sheet Series for Blanding's Turtle <br /> (http://files.dnr.state.mn.us/natural_res ces/a als/reptiles_amphibians/turtles/blandings_turtl <br /> e/factsheet.pdf) . Construction and maint- e personnel shall be made aware of the <br /> Blanding's turtle and their habitat during pre-construction meetings. <br /> 1 <br /> November 2010 Page 116 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.