My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono Substation Expansion - Enviromental Assessment (1)
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono Substation Expansion - Enviromental Assessment (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/23/2021 2:52:01 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 4.8 Other Requirements. <br /> 4.8.1 Applicable Codes <br /> The Permittee shall comply with applicable requirements of the NESC including <br /> clearances to ground, clearance to crossing utilities, clearance to buildings, right-of-way <br /> widths, erecting power poles, and stringing of transmission line conductors. The <br /> transmission line facility shall also meet the North American Electric Reliability <br /> Corporation's (NERC)reliability standards. <br /> ' 4.8.2 Other Permits <br /> The Permittee shall comply with all applicable state, r'es and statutes. The Permittee <br /> shall obtain all required local, state and federal p its the project and comply with <br /> 1 the conditions of these permits. A list of the requi rm' s included in the route <br /> permit application and the environmental a essment • 'ermittee shall submit a copy <br /> of such permits to the Commission upon eq t. <br /> •- TY <br /> 4.8.3 Pre-emption <br /> Pursuant to Minn. Stat. § 216E.10. subs. .nd 2,this ro QE e permit shall be the sole route <br /> approval required to be obtained by the Pe ittee and th permit shall supersede and <br /> preempt all zoning, building, or land use rules, reg I.; •ih or ordinances promulgated by <br /> regional, county, local and special purpose government. <br /> 4.8.4 Delay in Construction <br /> If the Permitt - •t c menced ruction o improvement of the route within <br /> four year after the ate o issuance of •' permit,the Commission shall consider <br /> suspe 4n off: e I'''. it in ace• i inn. R. 7850.4700. <br /> November 2010 Page 1 15 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.