Laserfiche WebLink
I <br /> I <br /> 4.8 Other Requirements. <br /> 4.8.1 Applicable Codes <br /> The Permittee shall comply with applicable requirements of the NESC including <br /> clearances to ground, clearance to crossing utilities, clearance to buildings, right-of-way <br /> widths, erecting power poles, and stringing of transmission line conductors. The <br /> transmission line facility shall also meet the North American Electric Reliability <br /> Corporation's (NERC)reliability standards. <br /> ' 4.8.2 Other Permits <br /> The Permittee shall comply with all applicable state, r'es and statutes. The Permittee <br /> shall obtain all required local, state and federal p its the project and comply with <br /> 1 the conditions of these permits. A list of the requi rm' s included in the route <br /> permit application and the environmental a essment • 'ermittee shall submit a copy <br /> of such permits to the Commission upon eq t. <br /> •- TY <br /> 4.8.3 Pre-emption <br /> Pursuant to Minn. Stat. § 216E.10. subs. .nd 2,this ro QE e permit shall be the sole route <br /> approval required to be obtained by the Pe ittee and th permit shall supersede and <br /> preempt all zoning, building, or land use rules, reg I.; •ih or ordinances promulgated by <br /> regional, county, local and special purpose government. <br /> 4.8.4 Delay in Construction <br /> If the Permitt - •t c menced ruction o improvement of the route within <br /> four year after the ate o issuance of •' permit,the Commission shall consider <br /> suspe 4n off: e I'''. it in ace• i inn. R. 7850.4700. <br /> November 2010 Page 1 15 <br /> I <br />