Laserfiche WebLink
• Sedarski Direct Testimony-Schedule 11 <br /> PUC Docket No. E002/TL-11-223 <br /> OAH Docket No. 8-2500-22429-02 <br /> Page 2 of 2 <br /> Applicant's Minor Clarifications to the Environmental Assessment <br /> Page(s) Clarification <br /> terminations, each with a motor-operated transmission line switch;" <br /> The second bullet point should state: "Two single-phase coupling <br /> capacitor voltage transformers with carrier accessories;" <br /> The third bullet point should state: "Two 2000 amp wave traps with line <br /> tuner, and;" <br /> The fourth bullet point should state: "Six 76 kV maximum continuous <br /> operating voltage state class surge arrestors." <br /> p. 22 On page 22, the second sentence should state: "Xcel Energy also <br /> anticipates that construction of the substation would occur over the <br /> course of 9 to 15 months, with an average work force of approximately <br /> six workers" rather than "9 to 12 months." <br /> p. 24 On page 24, the second to last sentence under "Aesthetics" should state: <br /> "The height of the new equipment would be approximately 13 to 18 feet <br /> in height, with several steel deadend structures approximately 67 <br /> feet in height and two a shield poles approximately 100 feet in <br /> height" rather than "13 to 15 feet." <br /> p. 54 On Table 16 on page 54, all references to "Township" should be <br /> changed to City or removed if City is already referenced. <br /> p. 55 On page 55, § 7, fourth paragraph, second sentence should state, in part: <br /> "the Xcel Energy Proposed Route" rather than "the Xcel Energy <br /> Alternative." <br /> 2 <br />