Laserfiche WebLink
Sedarski Direct Testimony-Schedule 11 <br /> PUC Docket No. E002/TL-11-223 <br /> OAH Docket No. 8-2500-22429-02 <br /> Page 1 of 2 <br /> Applicant's Minor Clarifications to the Environmental Assessment <br /> Page(s) Clarification <br /> p. i and p. 1 The "Project Owner" and "Applicant" listed on pages i and 1 of the EA <br /> should be "Northern States Power Company, a Minnesota corporation" <br /> rather than "Xcel Energy." <br /> p. 5 and References to "Hunt Farm Home Owners Association" starting on p. 5 <br /> throughout and throughout the EA document should be "Huntington Farm Home <br /> the EA Owners Association" according to the applicable recorded plat. <br /> P. 7 On page 7, § 3.3 under Xcel Energy Proposed Route, the last sentence in <br /> the first paragraph should be replaced with the following statement: <br /> "The Project would also install fiber optic shield wire along the entire <br /> length of the Project for possible future use." <br /> P. 9 On page 9, § 3.6, the first sentence of the second paragraph of that <br /> section should state: "Xcel Energy indicates in its Route Permit <br /> Application that where the Project parallels a roadway or railroad, Xcel <br /> Energy anticipates placing poles approximately 5 to 10 feet within <br /> private property, overlapping with approximately 30 feet of anticipated <br /> right-of-way with road or railroad right-of-way", rather than "private <br /> ROW." <br /> p. 10 On page 10, first paragraph, third sentence should state: "A typical <br /> conductor consists of aluminum wires stranded around a core of steel <br /> wires stranded around a core of steel wires" rather than "A typical <br /> conductor is a cable consisting of aluminum wires . . . ." <br /> p. 12 On Figure 2 on page 12, the structure in the bottom center labeled "115 <br /> kV HP Single-Circuit 115 kV Single-Circuit Steel Davit Arm Structure" <br /> should be labeled "115 kV Single-Circuit Single Pole Vertical <br /> Configuration with Post Insulators." <br /> p. 17 On page 17, § 4.4, second paragraph, fourth sentence should be replaced <br /> with the following: "During grading, a an second access road will be <br /> created from the existing driveway which will provide two entrances to <br /> the fenced area of the planned substation." <br /> p. 18 On page 18, § 4.4, the first bullet point should state: "Two 115 kV line <br />