Laserfiche WebLink
SEDARSKI DIRECT TESTIMONY—SCHEDULE 5 <br /> PUC DOCKET No.E002/TL-11-223 <br /> OAH DOCKET No.8-2500-22429-02 <br /> PAGE 5 OF 9 <br /> Proposed Double Circuit 115/115KV <br /> Steel Davit Arm Structure <br /> — Approximate Location of <br /> Proposed Dead End <br /> Structure at Substation <br /> / <br /> ti, <br /> Prgpos,e_drSingle Circuit 115KV 7 . <br /> .� Steel Y=Frame Structure �3 <br /> $ <br /> — _ <br /> '-Tran narss?on'c <br /> y � aa a LApprox.imate �Q '-. <br /> f x - ;;. Pr000sed°Mir <br /> • `. Repla -m_ t <br /> s <br /> r <br /> Orono Substation Replacement and New 115KV Transmission Line Project November 16,2011 <br /> Photo 4 <br />