Laserfiche WebLink
SEDARSKI DIRECT TESTIMONY—SCHEDULE 5 <br /> PUC DOCKET No.E002/TL-I 1-223 <br /> OAH DOCKET No.8-2500-22429-02 <br /> PAGE 4 OF 9 <br /> Proposed Double Circuit 115/115KV <br /> Steel Davit Arm Structure <br /> Approximate Location of <br /> 3 Proposed Dead End Existing Distribution Line <br /> i Structure at Substation / <br /> .► - - — _ <br /> ' i <br /> • <br /> • <br /> Approximate Location of <br /> Y Proposed Orono <br /> Com'---4. "i��. .. Substation Replac .,, .' <br /> .c..›.,,,,,,. <br /> �4'O <br /> Orono Substation Replacement and New 115KV Transmission Line Project November 16,2011 <br /> Photo 3 <br />