Laserfiche WebLink
MINUTES OF THE <br /> ORONO PARK COMMISSION <br /> Monday,February 1,2021 <br /> 6:00 o'clock p.m. <br /> Carter moved, Stephens seconded,to recommend the Three Rivers recommended preferred route <br /> for the Diamond Lake Regional Trail to the City Council. VOTE: Ayes 5,Nays 0. <br /> Mr. Shurson thanked the Commission and noted Edwards should have the presentation. <br /> Edwards will forward the presentation out to the members and make sure it is in the minutes. <br /> Hudson asked when they would vote or make a recommendation on the optional trails. <br /> Edwards clarified as Three Rivers said,this is just a Masterplan before asking for funding, and as any <br /> segments started to get to a point where it looked like they would receive funding,those projects would <br /> come back to the City and go through for trails and ultimately the City Council for committing any <br /> dollars to them. <br /> Hudson asked if that would be the same for the trailhead, Summit Beach, and things of that nature. <br /> Edwards replied yes,as each of those got to the point where they are actually putting a specific project <br /> together. This Masterplan could take 20 years to get from Orono up to Dayton,but there may be some <br /> segments within the next 3-4 years. One opportunity for Orono may be what Three Rivers has as 02 on <br /> the presentation,which is Old Long Lake Road;Edwards noted they have to do a road project there <br /> within the next five years. At that point,the City may reach out to Three Rivers to let them know they <br /> will be doing a road project and find out if they have some funding to do the trail project and it could be <br /> done as one project. He noted the 05 connecter they keep talking about: if the Commissioners go drive <br /> that section, it is a hugely challenging piece and they looked at trying to do something when they did the <br /> 112 project which included that corner. The only way to get through there is there is a storm water pond <br /> and perhaps putting a boardwalk across one half of that. Although it is a really short segment, it may end <br /> up being a very costly one when they figure out how to actually do it because of the drain that is there. <br /> Roath asked if the Old Long Lake Road reconstruction goes all the way through 05. <br /> Edwards answered it goes just past, and the actual intersection coming around was part of the 112 project. <br /> He noted the 05 project may cost as much as all the rest of 02 there. <br /> Hudson asked if that is right where the creek comes out of the lake and where is the cemetery on this map. <br /> Edwards pointed out the cemetery onscreen and noted another little oddity if anyone ever wonders why <br /> they moved the boundary of the City south right there just to include that cemetery. Everything around it <br /> is Long Lake except the cemetery. <br /> Roath noted there is an existing trail on 01. <br /> Edwards replied that is the Luce Line. <br /> Roath meant to say 04. <br /> Edwards answered yes,04 is the new trail the City built as part of the 112 project and that trail continues <br /> on the north side of 112 all the way through to Otten Brothers. That will continue when they do phase 3 <br /> Page 6 of 13 <br />